Similar Projects
Small Structures and Drains Construction - US 231
Infrastructure
Design
$794,335 CJ est. value
Greencastle, IN 46135

Small Structures and Drains Construction - US 231
Infrastructure
Design
$794,335 CJ est. value
Greencastle, IN 46135

Pavement Patching - I-70
Infrastructure
Bidding
$4,000,000 CJ est. value
Cloverdale, IN 46120

Bridge Preventive Maintenance, Paved Invert and Pipe Lining
Infrastructure
Bidding
$800,000 CJ est. value
Cary, IN 46135

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wellness Center
New Construction, Infrastructure
Post-Bid
$1,100,000 CJ est. value
Greencastle, IN 46135

Division I - 2022 Water Distribution System Improvements
Infrastructure
Results
$700,000 est. value
Greencastle, IN

US 231 Utility Relocation Water Main and Sanitary Force Main Rebid
Infrastructure
Results
$647,432 CJ est. value
Greencastle, IN 46135

Ferguson Lumber
New Construction, Infrastructure - 11,908 SF
Construction
$3,000,000 CJ est. value
Coatesville, IN 46121

Small Structures and Drain Construction
Infrastructure
Bidding
$800,000 CJ est. value
Cary, IN 46135

New Wellness Center
New Construction, Infrastructure
Post-Bid
$16,000,000 CJ est. value
Greencastle, IN 46135

Water Utility Improvements - Division "B" Distribution System Improvements
Infrastructure
Results
$1,299,707 CJ est. value
Reelsville, IN 46171

Street Paving Ccmg 2023-2
Infrastructure
Bidding
$600,000 CJ est. value
Coatesville, IN 46121

Remodeling at Four Locations
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Greencastle, IN 46135

Water Utility Improvements Division "C" Administrative Office and Storage Building
Addition, Demolition, New Construction, Infrastructure
Results
$619,700 CJ est. value
Reelsville, IN 46171

Last Updated 01/05/2024 08:32 AM
Project Title

Drainage Ditch Correction - I-70

Physical Address View project details and contacts
City, State (County) Cloverdale, IN 46120   (Putnam County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Control No. 2002323 Federal/State No. 2002323 Drainage Ditch Correction Putnam County - on I-70 From Us 231 to 8.5 Miles West of Sr 39 (Rp 040+0052 to 051+0028 Completion Date July 01, 2024 IVOSB Goal: 3.00 Qualifications C(B) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 291 - Drainage Ditch Correction - I-70

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents