Similar Projects
Fy 21 Micro-Surfacing Package
Design
$500,000 to $1,000,000 est. value
Fort Hood, TX

Construction of Omega Ranch Phase 2 Subdivision Project
Bidding
TX

Phase 1 - Grading, Paving, and Utility Package for Stone Hill Ranch Estates
Bidding
TX

ABIA Detention Pond
Post-Bid
$700,000 est. value
Austin, TX 78719

Asphalt Overlay
Post-Bid
Liberty, TX 77575

Denton Enterprise Airport (DEA) Landside Paving Improvements
Results
$855,163 est. value
Denton, TX 76207

Purchase of Seal Coating, Resealing and Fogseal for Lavaca County Roads
Term Contract
Results
Hallettsville, TX 77964

Police Training Facility - Berm Improvements
Construction
Less than $2,200,000 est. value
Conroe, TX 77301

Safety Improvement Projects Highway:FM248
Bidding
$3,270,636 est. value
TX

FY2019 CIP Improvements Tumbleweed Trail Sewer, Water and Paving Replacement
Post-Bid
Less than $1,800,000 est. value
White Settlement, TX 76108

Streets Asphalt Overlay Project
Results
Less than $284,593 est. value
Dayton, TX 77535

Hazard Elimination and Safety Highway:IH10
Bidding
$1,941,653 est. value
TX

South Main Street Drainage Improvements from West Texas Avenue to West Gulf Avenue
Post-Bid
Baytown, TX 77520

Modification of Roadways at JB3 Pump Station
Results
Ennis, TX 75119

Flexible Base Highway :US0082
Bidding
Less than $995,000 est. value
TX

Last Updated 05/14/2020 03:20 PM
Project Title

San Jacinto County GLO CDBG-DR 2016

Physical Address View project details and contacts
City, State (County) Coldspring, TX 77331   (San Jacinto County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract provides roadway and drainage improvements for various streets throughout San Jacinto County, Texas. Construction shall take place in Precinct 1, 2 and 4 in San Jacinto County. Package 1 - Precinct 1 Roadway Improvements of Spring Ridge Road, Cedar Valley Road and Camilla Lake Road Package 2 - Precinct 2 Roadway Improvements of East Cherry Creek Drive Package 3 - Precinct 4 Roadway Improvements of Harrell Road and Holiday Boulevard.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents