Reported 06/04/2020 12:00 AM
Project Title

Primary Sludge Pump and Primary Settling Tank Mechanism Replacements

Physical Address View project details and contacts
City, State (County) Portland, CT   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the replacement of two primary sludge pumps and replacement of various parts in two primary settling tanks at the Portland wastewater treatment plant. Bids will be received for a single prime Contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents