Evans West
New Construction, Demolition - 715,000 SF
Conception
$160,000,000 est. value
Denver, CO 80204

Twin Peaks Lodge and Spa
Renovation, Addition
Conception
Ouray, CO 81427

Design Build Services for Stadium and Pool
Design
Colorado Springs, CO

Apex III Apartments
New Construction - 5,822,790 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Parker, CO 80112

Green Valley Ranch Pool Expansion
Addition - 24,000 SF
Bidding
$15,600,000 est. value
Denver, CO 80249

Eagle Pointe Pool Dehumidification Swimming Pool Replacement Unit
Bidding
Commerce City, CO 80022

Memory Square Pool Resurfacing
Post-Bid
Louisville, CO 80027

Bob Burger Recreation Center Play Pool Remodel
Post-Bid
Lafayette, CO

City Park Pool Replastering
Results
Fort Collins, CO 80521

Lap Pool Filtration System Replacement for Swimming Pool Complex
Results
Less than $60,000 est. value
Craig, CO 81625

Olde Town At Parker
New Construction - 1,309 SF
Construction
$850,000 est. value
Parker, CO 80134

Lodge at Black Forest Phase ll
New Construction - 375,358 SF
Construction
$10,000,000 est. value
Colorado Springs, CO 80908

Ridgeline 55 Plus Senior Apartments
New Construction
Pending Verification
Castle Rock, CO

Pikes Peak YMCA Mixed Use Development Phase 1
New Construction - 475,000 SF
Conception
$10,000,000 CJ est. value
Colorado Springs, CO

Parker Pool Dehumidfication Unit Replacement
Bidding
Parker, CO 80134

Last Updated 04/13/2021 11:01 AM
Project Title

Congress Park Pool

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method
Project Status Construction Commenced 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $6,700,000 to $7,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new, state of the art swimming pool, bath house, and pump house in place of the existing facility that is past its useful life. Replacement will begin with demolishing most of the existing facility including the pool, pump house, and bath house. Existing shade pavilion storage building, public art, and trees will be protected during construction and remain as a part of the new facility. A new 50 meter pool with 25 yard cross course constructed in roughly the same location as the existing pool. A youth pool will be built in a new location while the existing location will be demolished. Space surrounding the pool deck and perimeter fence is to be landscaped. The South side of the parking lot will be demolished and rebuilt to meet ADA requirements and include a bioswale providing water quality. An underground detention vault is planned in the South parking lot area; a variance request to remove the detention vault is currently pending approval and Unit Costs are being requested to itemize this scope of work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents