Similar Projects
Orange Center Boulevard Sanitary Improvements
Bidding
Less than $1,850,000 est. value
Orlando, FL 32805

Lift Station Replacement And Sewage Pipe Replacement at Maxwell Terrace Apartments
Post-Bid
$253,000 est. value
Orlando, FL 32805

Oakland Wastewater Collection and Transmission System
Post-Bid
$569,722 est. value
Oakland, FL

9th Street Gravity Sewer, Force Main and Water Main Improvements
Results
Winter Garden, FL 34777

Construction Manager at Risk Park, Utility, Trails and Other Public Projects
Results
FL

Grease Traps Cleaning Services
Term Contract
Post-Bid
Less than $10,000 est. value
Orlando, FL 32802

Parks Camp Joy Sewer and Sanitary Force Main
Results
Less than $440,000 est. value
Apopka, FL 32712

Wastewater Services
Results
FL

Gravity Main CIPP Lining Term Contract
Term Contract
Results
Less than $400,000 est. value
FL

Gravity Package No. 31
Results
$703,401 est. value
FL

Raleigh Street Sanitary Sewer Replacement
Results
Less than $1,800,000 est. value
Orlando, FL

Lateral CIPP Lining
Term Contract
Results
Less than $450,000 est. value
FL

Gravity Package No. 28
Results
$2,559,427 est. value
FL

Gravity System Improvements
Results
$4,100,000 est. value
FL

Magnolia Park and Eco Tourism Utility Extension
Results
$550,000 est. value
Apopka, FL 32703

Last Updated 03/08/2019 09:59 AM
Project Title

Gravity Package No. 28

Physical Address View project details and contacts
City, State (County) FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,559,427
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work consists of furnishing all labor, equipment, and materials for the improvements of cured in place pipe (CIPP) lining 37,428 linear feet of eight inch gravity main; CIPP lining 9,830 linear feet of 10 inch gravity main; CIPP lining 2,647 linear feet of 12 inch gravity main; CIPP lining 1,738 linear feet of 15 inch gravity main; CIPP lining 1,280 linear feet of 18 inch gravity main; CIPP lining 30 linear feet of 24 inch gravity main; CIPP lining of service laterals and installation of service cleanouts.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents