Last Updated | 12/11/2019 12:37 PM |
Project Title | Broward Hall Renovation Phase II: CM-At Risk Services |
Physical Address | View project details and contacts |
City, State (County) | Gainesville, FL (Alachua County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $6,400,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In 2013 and 2014, the Broward Hall renovations provided nearly 11,000 SF of improved space for the UF Teaching Center for the College of Liberal Arts and Sciences. This final phase will improve nearly 5,000 SF for student study space and multi-purpose use and in addition, the renovations will create multi-purpose space for students and campus partners. Support space will also be created for Building Services as well as Residential Life and Education. This renovation will include HVAC upgrades in the center section, completion of fire sprinkler system, upgrade to fire alarm system, upgrade to electrical system, improve restrooms and improve common areas. The estimated construction budget is approximately $5,300,000 and does not include any site work or underground utilities upgrades. The project will be delivered using the Construction management at Risk method and construction will be on an extremely fast track and specific time allotment for construction during Summer of 2020 which is a MANDATORY requirement to be met if applying for this project. The contract for construction management services will consist of two phases, pre-construction and construction. Pre-construction services will begin at the Advanced Schematics Design stage and will include production of cost studies and estimates; value engineering; analysis of the design documents for constructability, coordination, detailing, materials, and systems; development and maintenance of the construction schedule; production of detailed jobsite management plans; development of strategies for the procurement of trade contracts; development of waste management strategies; and development of a Guaranteed Maximum Price (GMP) proposal based on 60/100% Construction Documents. If the GMP proposal is accepted and executed, the construction phase will be implemented. In this phase, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall ensure the timelines provided in the Program is met for material procurement and publicly bid trade contracts and be ready for the Summer 2020 start of work in various shifts. Failure to negotiate an acceptable fee at any phase of the contract, or failure to arrive at an acceptable GMP budget within the time provided in the agreement, may result in the termination of the construction manager's contract. |
||||||||||||||||||||||||||||||||||||||
Details | 1 College/University, 11,000 SF Renovation.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |