Similar Projects
B402 Elevator Replacement Tomah VA Medical Center
Term Contract
Design
$2,000,000 to $5,000,000 est. value
Tomah, WI 54660

Install New Elevator B-23
Infrastructure
Design
$3,000,000 to $5,000,000 est. value
Tomah, WI 54660

Elevator Modernization - Law Enforcement Center
Renovation
Sub-Bidding
$400,000 CJ est. value
Racine, WI 53403

Elevator Upgrades and Repairs
Renovation
Sub-Bidding
$205,000 CJ est. value
Milwaukee, WI 53211

Dodge County - Henry Dodge Elevator Modernization
Renovation
Post-Bid
Juneau, WI 53039

Elevator Consulting
Alteration
Post-Bid
Madison, WI

Central Maintenance Facility Lift Replacement
Results
Eau Claire, WI 54703

Elevator Maintenance
Alteration
Results
Madison, WI 53703

VLM (Vertical Lift Machine) Disassembly and Relocation
Alteration
Post-Bid
Madison, WI

Village on Park Elevator Replacement of Power Unit and Hydraulic Jack
Alteration
Results
Madison, WI 53713

Small Full Service Elevator Maintenance
Term Contract
Post-Bid
Chicago, IL - Olathe, KS - Fort Worth, TX - Milwaukee, WI 60638

Elevator Services for the University of Wisconsin-Milwaukee Housing Department
Alteration
Results
Milwaukee, WI 53211

Small Elevator Inspection/Testing Services
Term Contract
Post-Bid
Chicago, IL - Milwaukee, WI 60638

ADA Vertical Platform Lift
Alteration
Results
Appleton, WI 54911

Elevator Maintenance Services
Term Contract
Post-Bid
Chicago, Hines, North Chicago, IL - Milwaukee, WI 60612

Last Updated 12/01/2022 09:36 AM
Project Title

Administrative Facilities Elevator Upgrades

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53204   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $809,417 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The contract scope consists of: o New lighting, ventilation, signal fixtures, door operators, and non-proprietary control upgrades on Headquarters duplex #1-2, Skywalk #3 and Laboratory #4 elevators. o New finishes in existing Headquarters #1-2 car enclosures (Base Bid). o Replace existing Headquarters #1-2 car enclosures with new translucent panel car enclosures (Alternate Bid). o New finishes in existing Skywalk #3 and Laboratory #4 car enclosures. o Replace hydraulic pumping units Skywalk #3 and Laboratory #4 machine rooms. o Electrical conduit, wiring, lighting, receptacles, and switches. o New ventilation fan, thermostat, ducting, fire damper, and grilles in Headquarters #1-2 machine room. o New painted drywall ceiling in Headquarters #1-2 machine room. o New smoke detectors, existing smoke detector programming and existing smoke detector relocation. o Elevator maintenance services. o All other work defined in the specifications and shown on the plans.

Details

Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Common Work Results for Conveying Equipment, Commissioning of Conveying Equipment, Elevators, Escalators and Moving Walks, Escalators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents