Similar Projects
Attessa Motorsports Complex Master Plan
New Construction, Alteration
Conception
Casa Grande, AZ 85193

Territory Square Expansion Phase 1 - GG-29 - Town of Florence
Infrastructure
Conception
$2,500,000 est. value
Florence, AZ 85132

Attesa Motorsports Complex - Garages & Paddock
New Construction
Design
Casa Grande, AZ 85193

AutoZone #2777 / Apache Junction
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Apache Junction, AZ 85120

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Cactus Middle School Site Improvements
Post-Bid
Casa Grande, AZ 85122

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Crack-Fill All Asphalt Areas (Parking Lots And Drive Lanes) Maricopa, Az
Results
$25,000 est. value
Maricopa, AZ 85138

Thornton Road Improvements Project Phase I - Selma Highway to Peters Road
Infrastructure
Results
Casa Grande, AZ

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Villas At Stonegate
New Construction, Infrastructure
Pending Verification
$120,000,000 CJ est. value
Maricopa, AZ 85138

Honeycutt Run Subdivision
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Maricopa, AZ 85138

Salt River Project / Saint Solar
New Construction, Infrastructure
Conception
$127,000,000 CJ est. value
Coolidge, AZ 85128

Casa Grande Crossings
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Casa Grande, AZ 85122

Last Updated 12/20/2022 06:47 AM
Project Title

Picacho to Pinal Airpark Road (Casa Grande-Tucson Hwy(I-10))

Physical Address View project details and contacts
City, State (County) Picacho, AZ 85131   (Pinal County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $6,700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Tracs No: 010 PN 222 F0459 01C Project No: 010-D-NFA Termini: Casa Grande - Tucson Highway (I-10) Location: Picacho to Pinal Airpark Rd Route No. Milepost District Item No. I-10 222.00 to 231.71 Southcentral 102784 The amount programmed for this contract is $6,700,000. The location and description of the proposed work are as follows: The proposed work is located in Pinal County on Interstate 10 (I-10) between mileposts 222.00 and 231.71 near Picacho. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with an Asphaltic Rubber - Asphaltic Concrete Friction Course (AR-ACFC). Additional work includes replacing pavement markings and other miscellaneous work. The time allowed for the completion of the work included in this contract will be 120 calendar days. The Arizona Department of Transportation, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252.42 U.s.c. 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. This Contract Is Subject to the Provisions of Arizona Revised Statutes Section 42-5075 -- Prime Contracting Classification; Exemptions; Definitions. No Award Will Be Made to Any Contractor Who Is Not a Duly Licensed Contractor in Accordance with Arizona Revised Statutes 32-1101 Through 32-1170.03. All Labor Employed on This Project Shall Be Paid in Accordance with the Minimum Wage Rates Shown in the General Wage Decision. These Rates Have Been Determined in Accordance with the Requirements of the Law and Issued by the Secretary of Labor for This Project. The Wage Scale Is on File in Contracts and Specifications Section and Copies May Be Obtained at All Reasonable Times. A Proposal Guaranty in the Form of Either a Certified or a Cashier's Check Made Payable to the State Treasurer of Arizona for Not Less Than 10 Percent of the Amount of the Bid or in the Form of a Surety (Bid) Bond for 10 Percent of the Amount of the Bid Shall Accompany the Proposal. Surety (Bid) Bonds Will Be Accepted Only on the Form Provided by the Department and Only from Corporate Sureties Authorized to Do Business in Arizona. Questions and Comments Concerning the Bid Package for This Project Shall Be Directed to the Individuals Noted Below: Iqbal Hossain, P.E. Group Manager Contracts & Specification AZDOT - Picacho to Pinal Airpark Road (Casa Grande-Tucson Hwy(I-10)) Completion Date: 120 Calendar Days

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents