Similar Projects
Dirt Road Paving - Joseph Griggs Road - Barrow County
Infrastructure
Conception
$300,000 CJ est. value
Winder, GA 30680

Water Line Replacement - Double Bridges Road At Bowman Mill - Barrow County
Infrastructure
Conception
$1,500,000 CJ est. value
Winder, GA 30680

Rough Grading Improvements Bryan County Megasite
Infrastructure
Design
$600,000 CJ est. value
Savannah, GA 31401

SR 56 From SR 24 to SR 121 Bypass
Infrastructure
Design
$700,000 est. value
Waynesboro, GA 30830

Construction of the School Nutrition Test Kitchen
New Construction, Infrastructure
Bidding
$45,000 CJ est. value
Canton, GA 30115

Urban Pathway Phase 1 Re-bid
Infrastructure
Bidding
$795,361 CJ est. value
Fitzgerald, GA 31750

Cable Barriers Upgrade
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Savannah, GA 31406

The Birches on Maple
New Construction, Infrastructure - 148,000 SF
Sub-Bidding
$40,000,000 CJ est. value
Carrollton, GA 30117

Site Preparation and Restoration for Portable Classrooms and Miscellaneous Paving or Patching
Post-Bid
Atlanta, GA 30339

On Call Environmental Services
Post-Bid
GA

Dry Docking and Repair of the Research Vessel Savannah 2021
Results
Athens, GA

Watershed Protection and Management Plan
Results
Less than $8,100 est. value
Kingsland, GA

Winder Retail Center - Site
New Construction
Construction
Winder, GA

Athens Retail Infrastructure And R.O.W. Site Development
Infrastructure
Construction
Athens, GA 30606

Hyundai Motors Electric Vehicle And Battery Manufacturing Plant
New Construction, Infrastructure
Pending Verification
$5,500,000,000 CJ est. value
Savannah, GA 31405

Last Updated 08/02/2022 05:31 AM
Project Title

FY22 Brunswick Inner Harbor Maintenance Dredging

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31520   (Glynn County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Dock/Pier/Marine, Environmental, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,420,985 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Jul 29, 2022 Contract Award Number: W912HN22C5005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JXVMX8LB9W17 Contractor Awarded Name: SOUTHERN DREDGING CO., INC. Contractor Awarded Address: Charleston, SC 29407-5969 USA Base and All Options Value (Total Contract Value): $2420985.00 Fiscal Year (FY) 22 Brunswick Inner Harbor Maintenance Dredging 1. This solicitation is set aside for competition only among small business concerns. The NAICS Code for this acquisition 237990. 2. This Acqusition w ill be procured in accordance w ith FAR 14 (Sealed Bidding). 3. The pricing information of the successful bidder shall be incorportated upon aw ard of the contract. 4. Per FAR 36.204, the Construction Magnitude of this contract is betw een $1,000,000.00 and $5,000,000.00 Contractual POC is Fabiola Ducelus at 912-652-5315, Fabiola.Ducelus@usace.army.mil The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be three months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County, Georgia. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:East River, 0+000 to 2+500 project depth is 36 with 1 of advanced maintenanceEast River, 2+500 to 4+500 project depth is 36 with 5 of advanced maintenanceEast River, 4+500 to 6+250 project depth is 36 with 1 of advanced maintenanceEast River, Turning Basin project depth is 36 with 1 of advanced maintenanceEnvironmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W912HN22B5002' to obtain more details.* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents