Similar Projects
AC Surfacing, Mill, AC Resurfacing, Pipe Work - US 12
Infrastructure
Conception
$2,886,000 CJ est. value
Selfridge, ND 58568

AC Surfacing, Mill, AC Resurfacing, Pipe Work - US 12
Infrastructure
Conception
$2,886,000 CJ est. value
Selfridge, ND 58568

Construction Standing Rock Sewer Main Replacements
Infrastructure
Bidding
$1,500,000 CJ est. value
Cannon Ball, ND 58528

Construction Standing Rock Sewer Main Replacements
Infrastructure
Bidding
$1,500,000 CJ est. value
Cannon Ball, ND 58528

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Structure Replacements
Demolition, New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Selfridge, ND 58568

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Mill and Overlay
Infrastructure
Results
$2,500,001 to $3,000,000 est. value
ND

Sliver Grading, Subcuts, Pipe Extensions, Pipe Rehabilitation, Structure Replacement, Milling and Rap Overlay
Infrastructure
Post-Bid
$9,000,000 CJ est. value
Selfridge, ND 58568

ND 31, JCT ND 25 (Hannover) N to JCT ND 200A; ND 24, JCT ND 6 N to S of Fort Yates; and ND 31, JCT ND 200A N to Harmon Ave (Stanton) - Micro-Mill, Slurry Seal and Micro-Surfacing
Infrastructure
Results
$1,000,001 to $1,500,000 est. value

ND 6, ND/SD STATE LINE N to near JCT CMC 4324 (Selfridge) - Seal Coat and Incidentals
Infrastructure
Results
$200,001 to $40,000 est. value
ND

Last Updated 01/17/2023 02:35 AM
Project Title

Replace Str Bridge, Approach Grading, Grading, AC Surfacing - US 12

Physical Address View project details and contacts
City, State (County) Selfridge, ND 58568   (Sioux County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $16,118,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US12 - Fm 3.5 W to 1.5 W of the Walworth Co Line. As of January 17, 2023, the project is in Conceptual status. Anticipated Construction year is 2026. SDDOT - Replace Str Bridge, Approach Grading, Grading, AC Surfacing - US 12 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents