Similar Projects
Mcnerney Hall HVAC Upgrades
Alteration
Bidding
Edinboro, PA 16444

Boiler Replacement at Curry/Schell Apartments
Post-Bid
Erie, PA 16508

Attic Insulation Replacement
Post-Bid
Erie, PA 16505

Furnace Retrofit/Modification/Replacement Services on Electric, Gas and Oil Fired Heating Systems and Small Plumbing Repairs
Results
Erie, PA

Construction of a New Warehouse - Heating and Ventilation Construction
Results
North East, PA 16428

HVAC Upgrade Project at Erie Downtown YMCA
Renovation - 110,000 SF
Construction
$113,000 est. value
Erie, PA 16501

H245--Boiler Safety Device Testing
Post-Bid
Coatesville, Erie, PA 19320

Crawford Boiler Replacement - HVAC Construction
Results
$425,000 to $475,000 est. value
Edinboro, PA 16444

H245--Boiler Safety Device Testing
Post-Bid
Wilmington, DE - Altoona, Coatesville, Erie, PA

Heating and Plumbing Contractors
Results
Corry, PA 16407

HVAC and Mechanical Products
Term Contract
Post-Bid

Exhaust Replacement at Friendship Apartments
Results
Erie, PA 16501

Heating System Drain and Install Glycol Flush
Post-Bid
Erie, PA 16505

4120--Replace Dry Cooler System for IT
Results
$500,000 to $1,000,000 est. value
Erie, PA 16504

Montessori Regional Charter School East Wing Restroom Renovations Project - HVAC Construction
Post-Bid
Erie, PA 16505

Reported 01/11/2022 12:00 AM
Project Title

Waste Heat Boiler Rehabilitation - HVAC Construction

Physical Address View project details and contacts
City, State (County) Erie, PA 16507   (Erie County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $2,920,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally includes rehabilitation of the sludge incinerator waste heat boilers including replacement of the tubes and soot blower system, replacement of the boiler system condensate tank and deaerator, heating water and cooling water piping replacement, piping modifications, related electrical and instrumentation equipment, and installation of new Overflow Retention Facility (ORF) flow meter.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents