Similar Projects
John M. Price District Attorney Building - Replace Carpet Throughout Facility - P000176 - Sacramento County
Alteration
Conception
$868,000 est. value
Sacramento, CA 95814

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

District Wide Flooring Phase 1
Renovation
Sub-Bidding
$40,000 CJ est. value
Rialto, CA 92376

Flooring Replacement in Santa Clara County
Term Contract
Sub-Bidding
Cupertino, CA 95014

Pka - Bldg 381 Carpet
Term Contract
Post-Bid
Fairfield, CA 94534

Wiley Manuel DA Carpet Replacement
Alteration
Post-Bid
Oakland, CA 94607

FEMA Region 9 Non-Static VCT Flooring
Term Contract
Results
Oakland, CA 94607

Orchard Dale Elementary School Modernization Project- Flooring
Alteration
Results
Whittier, CA 90603

Flooring Project
Renovation
Sub-Bidding
$80,000 CJ est. value
San Diego, CA 92128

S201--Flooring Services; Strip & Seal Vinyl Composition Tile
Term Contract
Post-Bid
Palo Alto, CA 94304

Scherer Senior Center Improvements
Alteration
Results
Yucaipa, CA 92399

Floor Covering at Various Sites
Renovation
Sub-Bidding
$250,000 CJ est. value
San Diego, CA 92101

12Th Marine Corps District Carpet And Install
Alteration
Post-Bid
San Diego, CA 92140

Riverside County Law Library Paint and Carpet Project
Alteration
Results
$500,000 est. value
Indio, Riverside, CA 92201

Barstow Flooring Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Barstow, CA 92311

Last Updated 01/25/2023 04:06 PM
Project Title

Pinole Valley High School Building E Lobby and Corridor Flooring Replacement Project

Physical Address View project details and contacts
City, State (County) Pinole, CA 94564   (Contra Costa County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $76,902 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 10 2022, the project has not yet been awarded. A timeline for award has not yet been established.** The Project consists of removal of existing flooring including existing crack filler, existing adhesive and existing wall base. Prepare concrete floor slab including repair work and install dust protection, new moisture control system, new resilient flooring and new wall base. Location : Pinole Valley High School

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents