Similar Projects
North Aud Block Infrastructure
New Construction
Conception
$10,000,000 est. value
Buffalo, NY 14203

Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Splash Car Wash
Renovation
Design
White Plains, NY 10607

New York Presbyterian Hudson Valley Hospital
New Construction - 34,375 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Cortland, NY 10567

35 Erie Blvd Site Improvements and Alternations
Renovation, Infrastructure
Bidding
$2,250,000 est. value
Menands, NY 12204

Boardman Road Library Wastewater Line Rerouting and Site Work
Infrastructure
Bidding
Poughkeepsie, NY 12603

Hawkins Hall Courtyard Garden Construction
Post-Bid
Plattsburgh, NY 12901

Site Clearing and Vegetation Control
Term Contract
Post-Bid
Rush, NY 14543

Binghamton City Hall Green Infrastructure Project Phase II
Results
Binghamton, NY 13901

Areas No. 1 Restoration
Term Contract
Results
Cheektowaga, NY 14227

Maria College Campus Development
Renovation, Addition - 1,120 SF
Construction
$5,000,000 est. value
Albany, NY 12208

Daisy Barn Campground
New Construction
Construction
$1,600,000 est. value
Wilson, NY 14172

Habitat Restoration and Clean-Up
Alteration
Bidding
Bay Shore, Shinnecock Hills, NY 11706

Birchwood Water Tank Site Improvements and Landscaping Project 2020
Post-Bid
Greenburgh, NY 10607

Area No. 2 Restoration
Term Contract
Results
Cheektowaga, NY 14227

Reported 09/08/2021 12:00 AM
Project Title

RIT - Tait Preserve - Site Improvements

Physical Address View project details and contacts
City, State (County) Rochester, NY 14625   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected September 2021, Construction Completion Expected November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of two primary parts: Driveway/road • Installation of storm drainage and gutters downhill from the main entrance gate. • (Includes two alternates) All box out from the road is to be removed from site. Work will need to be done in a manner that doesn’t leave any open excavation at the end of the work day. • Soil shoulder areas will need to be stabilized to eliminate wash out during construction and erosion controls until satisfactory germination occurs. Lodge area • Creation of a parking circle (51 spaces) comprised of grass pavers & asphalt drive lanes. • Installation of water tank for fire suppression system and assorted site electric/lighting. • Successful contractor will have to work with preselected Irrigation Company (allowance will be included) • There will also be an allowance included for additional landscaping. • Base bids will include all lawn/landscape restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents