Similar Projects
Annual Contract/Painting and Weatherproofing
Term Contract
Bidding
FL

Palm Beach County Sheriff's Office Exterior Hardening
Post-Bid
West Palm Beach, FL

CM-at-Risk Services - Architecture Building Exterior Envelope Repair
Post-Bid
Less than $5,000,000 est. value
Gainesville, FL

Sunshade Structure - EPA Gulf Breeze, FL
Results
Gulf Breeze, FL 32561

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

UCF Downtown/Dr. Phillips Academic Commons
Construction
$66,000,000 est. value
FL

Lee County Downtown Jail Corridor Ceiling Replacement
Construction
Fort Myers, FL 33901

54--Building Roof Top Guardrail System
Post-Bid
Panama City, FL 32407

TGK Facility Re-Roof - Pressure Wash and Seal Exterior Building
Results
Less than $3,350,000 est. value
FL

Awning Repair, Recover and Install
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34235

N--Service: Recover Awnings Building 2 and 42
Results
Tampa, FL 33612

Exterior Painting Projects for Vernon E. Hargray Youth Enrichment Center and Sunset Lakes Community Center
Post-Bid
Miramar, FL 33025

UCF Spectrum Stadium Rust Remediation
Results
Orlando, FL 32816

Gutter Replacement
Post-Bid
Palm Harbor, FL 34683

Facility Maintenance Services for Cecil Airport
Results
Jacksonville, FL 32221

Last Updated 02/03/2021 10:51 AM
Project Title

Structural Repair to Exterior Metal Pan Stairs at BAK Middle School

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33407   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Sub-Bidding Closed
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Remove all concrete to expose all stair pans and risers that have deteriorated beyond repair, fabricate new, deliver and weld all pans, risers and tread nosing as described. Repair all center hand rails as required and pour back concrete in all stair pans replaced. Sand all risers, tread nosing and stringers affected by the repairs and paint with a Zinc based coating. Fill with 3M metal bonding filler any holes in risers (if less than 2) smaller than 1". As an alternate price the sand blasting and paint of all rails and handrails.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 08 - Openings, Vents, Wall Vents.
Division 09 - Finishes, Painting, Exterior Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents