Similar Projects
New K-5
Conception
FL

Shelton Academy
Renovation, Addition - 82,987 SF
Design
Doral, FL

Hialeah Gardens Elementary School Addition and Renovations
Renovation, Addition
Design
Less than $1,945,535 est. value
Hialeah Gardens, FL 33018

Palm Springs ES: Gob Renovation
Renovation
Sub-Bidding
$5,000,000 est. value
Hialeah, FL 33013

Comstock Elementary School
Addition
Post-Bid
Miami, FL 33142

Golden Glades Elementary - Interior and Exterior Renovations
Renovation
Post-Bid
$2,000,000 est. value
Opa-locka, FL 33054

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement
Renovation
Results
Less than $4,143,452 est. value
Hialeah, FL 33012

New Elementary School (K-5) - (A Reuse of Doral Grand Bay K-8, Phase I)
New Construction - 50,000 SF
Results
Miami, FL 33187

Palmer Trinity School - Classroom Building
New Construction - 2,100 SF
Construction
$500,000 to $1,000,000 CJ est. value
Palmetto Bay, FL

Temple Beth Am - Classroom Building
New Construction - 8,200 SF
Construction
Pinecrest, FL

Mater Academy
New Construction
Design
Hialeah Gardens, Miami, FL 33018

Fairlawn Elementary School New Addition and Renovation
Renovation, Addition
Post-Bid
Miami, FL 33144

Nathan B. Young Elementary School Renovations
Renovation
Results
Opa-locka, FL

Caribbean K-8 Center Addition
Addition
Construction
Miami, FL 33177

Sylvania Heights Elementary Renovations
Renovation
Post-Bid
Miami, FL 33155

Reported 09/18/2021 12:00 AM
Project Title

Twin Lakes Elementary School

Physical Address View project details and contacts
City, State (County) Hialeah, FL 33012   (Miami-Dade County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of work Involves the GOB Funded Phase II Renovations of Existing School, Twin Lakes Elementary, to Accommodate a New Complete System HVAC Replacement; Replacement of Damaged Exterior Windows and Wood Doors and Frames of Building No. 6 (a single story structure); the Replacement of Doors and Frames Not Previously Replaced in Administration and Other Classrooms Buildings. Local Workforce Requirement - 20% ---------------------------- Bid Form Packages Available in ITB - Bid Package A - Sitework/Demolition Bid Package B - Concrete/CMU/Stucco Bid Package C - Doors Bid Package D - Windows Bid Package E - Painting Bid Package F - Acoustical Ceiling Bid Package G - Window Treatments Bid Package H - Mechanical Bid Package I – Plumbing Bid Package J - Electrical

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents