Similar Projects
Dawson High Agriculture Center
New Construction
Conception
Dawsonville, GA

Multi-Purpose Building
New Construction
Conception
Dawsonville, GA 30534

Resurgence Hall Charter School
Renovation - 18,740 SF
Design
$8,540,800 est. value
East Point, GA 30344

Murray County High and Early Learning Center School Renovations Modifications and Additions
Renovation
Bidding
Chatsworth, GA 30705

Atlanta Virtual Academy
Renovation
Bidding
Atlanta, GA 30318

CMAR - Mcintosh County Middle School Kitchen and Cafeteria Modifications
Renovation
Sub-Bidding
Less than $1,000,000 est. value
Darien, GA 31305

New West Laurens Middle School Campus and Middle School Athletic Complex
New Construction
Post-Bid
Less than $35,000,000 est. value
Dublin, GA 31021

Bremen High School Additions and Alterations
Renovation, Addition - 66,200 SF
Post-Bid
Bremen, GA 30110

New East Laurens High School Campus and Football Stadium - CM at Risk Services
New Construction
Results
Less than $34,000,000 est. value
Dublin, GA

Pebblebrook New Gym, Theater and Addition
New Construction, Addition, Demolition
Results
Less than $47,700,000 est. value
Mableton, GA

KIPP Atlanta Collegiate High School
Renovation, Addition - 127,391 SF
Construction
$10,000,000 est. value
Atlanta, GA 30314

General Contractor Services - Coralwood Diagnostic Center Additions and Renovations
Renovation, Addition
Construction
Less than $5,600,000 est. value
Tucker, GA

Modular Classroom Units
New Construction
Bidding
Bainbridge, GA

Wood Wilkins Center at Lemon Street Project
Post-Bid
Marietta, GA 30060

Centennial High School Renovation and Additions
Renovation, Addition
Results
Less than $8,993,000 est. value
Roswell, GA 30076

Last Updated 11/23/2021 09:40 AM
Project Title

HCS- Addition to Dutchtown High School

Physical Address View project details and contacts
City, State (County) Hampton, GA 30228   (Henry County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,506,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the construction of an addition of (14) Classrooms and (2) Science Labs along with associated Workrooms, Offices and Restrooms to the original building which was completed in 2004. The original construction type was Type IB Construction (sprinklered) consisting of primarily load bearing construction. The new addition is Type IB Construction (sprinklered) consisting of structural steel frame (with sprayed fire protection) and masonry infill with brick veneer exterior. The roof system is SBS Modified Bitumen on lightweight insulated concrete roof deck along with gable type skylight units. The HVAC equipment is gas fired rooftop units with bipolar ionization. Also, including in the work are low voltage systems including fire alarm, intercom, surveillance and intrusion detection systems. Refer to specifications for further descriptions of finishes, doors, windows, power, lighting, and plumbing systems.

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents