Similar Projects
Bridge Replacement
New Construction, Demolition, Infrastructure
Conception
$2,011,226 est. value
Lynnville, IN 47619

Replace Superstructure
Demolition, New Construction, Infrastructure
Design
$3,646,000 CJ est. value
Lynnville, IN 47619

Replace Superstructure
Demolition, New Construction, Infrastructure
Design
$3,646,000 CJ est. value
Lynnville, IN 47619

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Brompton Directional Drill
Infrastructure
Results
Newburgh, IN

Warrick County Indoor Sports Complex
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Newburgh, IN 47630

Warrick County Indoor Sports Complex
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Newburgh, IN 47630

Small Structure Replacement
Demolition, New Construction, Infrastructure
Design
$2,024,438 CJ est. value
Boonville, IN 47601

Water System Improvements 3rd Street Water Main Relocation
Infrastructure
Post-Bid
Boonville, IN

2021 Community Crossings Matching Grant
Infrastructure
Results
Newburgh, IN

Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$2,011,226 CJ est. value
Lynnville, IN 47619

RFP Engineering - Preliminary Engineering for Epworth Road
Infrastructure
Post-Bid
$15,000,000 CJ est. value
Ohio Township, IN 47630

2022 CCMG Street and Stormwater Improvements
Infrastructure
Results
$3,000,000 est. value
Boonville, IN

Last Updated 01/18/2023 03:14 PM
Project Title

Chandler Water Transmission Line

Physical Address View project details and contacts
City, State (County) Chandler, IN 47610   (Warrick County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $15,400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Chandler Utilities (Owner) is requesting Bids for the construction of the following Project: Chandler Water Transmission Line Bids for the construction of the Project will be received. The Project includes the following Work: Construction of 41,000 LF of 24- inch ductile iron pipe water main, 6,000 LF of 12-inch water main, approximately 30 isolation valves, 1 above-ground pressure reducing valve structure, 3 blow-off assemblies, approximately 10 hydrants, several tapping connections, and associated appurtenances. Preceding the transmission main installation will be 22 acres of clearing and grubbing of brush with some trees, and following installation will be road and driveway restoration and lawn and landscaping repairs where needed. Bids are requested for a single prime Contract. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Following registration, complete sets of Bidding Documents may be downloaded from the Issuing Office's website as "zipped" portable document format (PDF) files. The cost of printed Bidding Documents from the Issuing Office will depend on the number and size of the Drawings and Project Manual, applicable taxes, and shipping method selected by the prospective Bidder. Cost of Bidding Documents and shipping is nonrefundable. Upon Issuing Office's receipt of payment, printed Bidding Documents will be sent via the prospective Bidder's delivery method of choice; the shipping charge will depend on the shipping method chosen. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of the Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Pre-bid Conference. Instructions to Bidders For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bid security, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, shall be furnished in accordance with the Instructions to Bidders. The Owner reserves the right to reject any and all Bids in whole or in part as specified in the solicitation when it is not in the best interest of the governmental body as determined by the purchasing agency in accordance with IC 5-22-18-2. The Owner also reserves the right to waive irregularities in any Bid, and to accept any Bid, which is deemed most favorable to the Owner. Section 436 (a)(1) of the Consolidated Appropriations Act, 2014 require that none of the appropriated funds may be used for the construction, alteration, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States unless (a) a waiver is provided to the recipient by U.S. EPA ("EPA Waiver") or (b) compliance would be inconsistent with United States obligations under international agreements. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents