Similar Projects
West Street Office and Warehouse Development
New Construction, Infrastructure - 30,000 SF
Design
$11,190,000 CJ est. value
Wichita, KS 67213

DeVaughn James Injury Lawyers Office Expansion / Wichita
Addition, Demolition, Renovation, Infrastructure - 3,000 SF
Design
$990,000 CJ est. value
Wichita, KS 67226

Cypress - Towne Parc 8th Addition
Infrastructure
Bidding
$200,000 CJ est. value
Wichita, KS 67202

Cypress - Towne Parc 8th Addition
Infrastructure
Bidding
$200,000 CJ est. value
Wichita, KS 67202

Airfield Paint & Rubber Removal Maintenance - Mcconnell AFB Fy21
Term Contract
Post-Bid
$100,000 to $250,000 est. value
McConnell AFB, KS

Derby Destination Development Ii - Phase Ii
Infrastructure
Post-Bid
Derby, KS

Maize Road Crosswalk Improvements
Infrastructure
Results
$64,802 est. value
Maize, KS 67101

2020 Arterial Sidewalk and Wheelchair Ramp Program Phase 2
Infrastructure
Results
Wichita, KS

High Plains Development Seventeenth
Demolition, New Construction, Infrastructure
Pending Verification
$72,000,000 CJ est. value
Wichita, KS 67208

High Plains Development Seventeenth
Demolition, New Construction, Infrastructure
Pending Verification
$72,000,000 CJ est. value
Wichita, KS 67208

Dutch Bros Coffee - Greenwich Place / Wichita
New Construction, Infrastructure
Design
$300,000 CJ est. value
Wichita, KS 67226

Grading, Bridge and Surfacing
Infrastructure
Bidding
$900,000 CJ est. value
Attica, KS 67235

Sweeping Parking Lots and Garages
Term Contract
Post-Bid
Wichita, KS

Botanica Parking Lot Expansion
Infrastructure
Results
Wichita, KS

Riverfront Village
New Construction, Infrastructure - 512,000 SF
Pending Verification
$127,000,000 CJ est. value
Wichita, KS 67202

Last Updated 08/30/2022 04:03 PM
Project Title

Ridge Road and Village Circle Traffic Signalization

Physical Address View project details and contacts
City, State (County) Wichita, KS 67205   (Sedgwick County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Ridge Road and Village Circle Traffic Signalization Any questions prior to bid submittal should be directed to Shawn Mellies, P.E., Project Engineer, at (316) 268-4632 or smellieswichita.gov. The work on this project shall be completed within 50 (fifty) working days from the date of beginning work and in accordance with the plans and Standard Specifications. Working days will be charged as provided for in the Standard Specifications, once the work order is issued. The non-availability of material shall not prevent working days from being assessed. A Bid Bond in the Amount of Five Percent (5%) of the Total Bid or an Annual Bid Bond is Required Prior to Bid Opening

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents