Similar Projects
Preventative Maintenance and Emergency Repair Services for Boilers
Bidding
Hamilton, NJ

Building Management System
Bidding

Steam Boiler Replacement at Wilson Homes
Post-Bid
Trenton, NJ 08638

Relocation of Heat Exchangers
Post-Bid
Less than $529,814 est. value
Trenton, NJ 08608

Roofing and HVAC Equipment Replacement at the Fine Arts Building
Results
West Windsor, NJ 08550

Maintenance Services for Instrumentation, Controls and Variable Speed Drives
Results
Lawrenceville, NJ

Mechanical Upgrades - Partial Roof Top Unit Replacement
Bidding
Washington, NJ 07882

IT Room Cooling
Post-Bid
$952,202 est. value
Ewing, NJ 08625

Boiler Maintenance, Repair and Emergency Replacement
Results

Natatorium Unit Replacement for Princeton Unified Middle School
Bidding
Princeton, NJ 08540

Purchase and Install High Efficiency Boilers, Heat Exchangers and all Associated Equipments, Controls
Post-Bid
Hightstown, NJ 08520

HVAC Systems Inspection, Repair and Preventative Maintenance Contract
Term Contract
Results
Atlantic City, Camden, Dover, Egg Harbor Township, Fairview, Hackensack, Hamilton, Howell, Irvington, Jersey City, Lakewood, Maplewood, Newark, North Bergen, Nutley, Old Bridge, Oradell, Orange, Paterson, Ridgefield, Turnersville, Wayne, Weehawken, Wildwood, NJ

Control System Integration for Airedales Multiple Schools
Bidding
Princeton, NJ 08542

Fusion Computation Center (FCC) Air Conditioning Upgrades
Post-Bid
$750,000 to $1,250,000 est. value
Princeton, NJ 08543

Chiller Replacement at Fisher MS, Antheil ES, and Parkway ES
Results
Less than $1,195,000 est. value
Ewing, NJ 08618

Last Updated 02/24/2021 10:04 AM
Project Title

Partial Replacement of Mechanical System at Perry L. Drew Elementary School

Physical Address View project details and contacts
City, State (County) East Windsor, NJ 08520   (Mercer County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes, but not limited to; replace main mechanical units, replace internal components, associated electrical and plumbing work, replace heat recovery box and exhaust fan, replace multiple heat pumps in mechanical room.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents