Similar Projects
Airport Wastewater Treatment Plant Expansion Project
Design
FL

City of Dunedin Water Treatment Plant Refurbishment
Term Contract
Post-Bid
$26,500,000 est. value
Dunedin, FL

Wastewater Treatment Facility Operations Building and Hardening Of Biosolids Facility
New Construction
Post-Bid
$66,750 est. value
Clearwater, FL

Oxygen Production Upgrades SDWWTP
Results
Less than $8,267,365 est. value
Miami, FL

Water and Wastewater Treatment Facility Rehabilitation and Repairs - WORCS 9
Term Contract
Results
Less than $1,320,000 est. value
FL

Westside Regional Water Reclamation Facility Improvements
Construction
Less than $30,500,000 est. value
Daytona Beach, FL 32124

New Well and Water Plant No. 4 & 5
New Construction
Construction
$1,546,710 est. value
Jay, FL 32565

Water Treatment Plant Filters
Term Contract
Post-Bid
FL

South County AWTP Expansion - Phase 3 and 4
Results
$8,200,000 est. value
Ruskin, FL

Deltona North Water Treatment Plant Improvements
Construction
Less than $1,800,000 est. value
De Land, FL 32720

Wastewater Reclamation Facility - Headworks Mechanical Screen Project
Post-Bid
Gainesville, FL

David L. Tippin Water Treatment Facility Chemical System Improvements Design-Build
Results
$12,000,000 est. value
Tampa, FL

Plantation Bay Water Treatment Plant Improvements
Construction
Less than $3,750,000 est. value
Bunnell, FL 32110

Advanced Wastewater Treatment Plant P-663 at Naval Station Mayport, Jacksonville Florida
Post-Bid
$25,000,000 to $100,000,000 est. value
Amelia City, Jacksonville, FL 32034

Design Build - Dunn Water Reclamation Facility Filtration and Disinfection Improvements Project
Results
$7,750,000 est. value
Palm Harbor, FL 34683

Reported 12/07/2018 12:00 AM
Project Title

Construction Manager, Cosme Water Treatment Plant Optimization and Header Valve Replacement Projects

Physical Address View project details and contacts
City, State (County) Odessa, FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replace temporary caustic storage and metering system with a permanent caustic storage building and metering pumps to be located in the ammonia building. Relocate chlorine booster pumps and replace temporary chlorine solution piping inside the chlorine building. Provide an additional fluoride metering pump and piping modification inside the fluoride building. Replace temporary chemical piping with new piping to be contained in a concrete trench. Construct new 36" and 48" buried and above-grade piping that will receive bypassed Regional water and water treated from the plant, and which will direct the bypassed and blended water to the City's water transmission mains. Replace surge tank valves. Reconfigure stormwater retention pond. Replace temporary piping constructed by Tampa Bay Water that connected the Northwest Hillsborough TM and the South Pasco TM, with permanent piping to connect the two pipelines. Remove and replace existing gate, butterfly, altitude, ball and cone valve and hydraulic control structures. Provide power feed system, status wiring, interface and integration. Remove the old air compressed system. Remove the abandoned generator cooling water system. Install a new sump pump within existing sequence vaults. Structural and coating inspection of the three clearwells. Install new flow meters.
Details
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents