Similar Projects
Restore Shoreline
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Canaveral As, FL

Melbourne Estates/Henry Ave Water Main/ Drainage Project
Infrastructure
Bidding
$4,000,000 est. value
West Melbourne, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Thrush Drive Baffle Box
Results
$579,460 est. value
Melbourne, FL 32935

Malabar Road Drainage Pipe Repairs
Results
Less than $500,000 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement Unit 20
Results
Less than $318,920 est. value
Palm Bay, FL 32907

Drainage Outfall Repair
Results
Less than $250,000 est. value
FL

THS Basin Baffle Box Improvement
Results
Less than $282,000 est. value
Titusville, FL

Drainage Repair
Results
Less than $800,000 est. value
FL

Drainage Repair
Results
Less than $400,000 est. value
FL

Culvert Pipe Replacement Emerson Drive at Canal C-51
Results
Less than $455,665 est. value
Palm Bay, FL 32907

Orange Street Drainage Improvements
Results
Less than $756,882 est. value
Melbourne Beach, FL 32951

Culvert Pipe Replacement Tranter Ave at Canal C-41R
Results
GRANT VLKRIA, FL 32909

Drainage Improvements
Infrastructure
Results
$2,552,070 est. value
FL

Last Updated 03/14/2022 07:36 AM
Project Title

Sebastian Inlet North and South Shoreline Stabilization Project

Physical Address View project details and contacts
City, State (County) Indialantic, Melbourne Beach, FL 32951   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $825,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The excavation and rehabilitation of approximately 655 linear feet of continuous stabilization along the northern shoreline of Sebastian Inlet. The North Shore portion of the project is just west of the Tide Pool, at the end of Cove Road. The work will cover a relic, steel sheet piling with limestone rip rap, and then repair and replace a rip rap revetment. The Construction Plans also delineate distinct areas along the South Shore that are designated for repair, starting beneath the catwalk under the A1A Bridge and proceeding west to the T-Dock.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents