Similar Projects
Last Updated | 04/08/2022 11:55 AM |
Project Title | Fire System Inspections |
Physical Address | View project details and contacts |
City, State (County) | Atwater, CA 95301 (Merced County) |
Category(s) | Professional Services |
Sub-Category(s) | Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The DOJ BOP Field Offices- USP ATWATER requires the following items, Purchase Description Determined by Line Item, to the following: LI 001: Annual fire detection system alarm/pull station testing (simplex is the brand) of approximately 15 fire alarm panels, 35 fire alarm annunciators, 540 smoke heads, 240 pull stations, 45 heat detectors, 140 duct detectors, 60 flow switches, 70 tamper switches in a United States Penitentiary, to be performed in the month of March. Inspection shall be conducted in accordance with NFPA 72 and any other applicable standards., 1, JOB; LI 002: Annual fire sprinkler/riser test of approximately 53 wet risers, 3 dry risers, and 2 electric fire pumps, in a United States Penitentiary, to be performed in the month of March. Inspection shall be conducted in accordance with NFPA 25 and any other applicable standards., 1, JOB; LI 003: Semi-annual inspection/maintenance of approximately 9 kitchen hood fire system in 2 kitchens located at the Federal Penitentiary in Atwater, California. Service shall include inspecting every pull station in every food prep station in the USP and Camp kitchens. Also replace or clean every fire system spray nozzle, replace every fusible link in the hood system, and replace fusible links in the chemical/battery storage at the Camp kitchen. Inspection/maintenance must be conducted in accordance with NFPA 96(11) and any other applicable standards. This solicitation is for semi-annual service, one to be performed in March and the second to be performed in September., 2, JOB; |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |