Similar Projects
Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

Fire Pumps and DW Pumps Maintenance and Repair
Term Contract
Bidding
Atlanta, GA 30303

Stormwater Utility On-Call Contractors
Post-Bid
Duluth, GA

Prequalified Contractors List
Post-Bid
East Point, GA

Edgehill Place Storm Drainage Repair
Results
Johns Creek, GA

Taylor Road and Batesville Road Stormwater Improvement
Results
Less than $49,901 est. value
Milton, GA

Statewide Drainage Asset Management Program
Post-Bid

12v 1-1/2 Submersible Water Pump Department of Public Works
Results
GA

Hardscrabble Road Landscape Project
Post-Bid
Roswell, GA 30075

Kimball Bridge Trail Landscaping
Results
Johns Creek, GA 30097

Landfill Maintenance FY 2020
Term Contract
Post-Bid
Less than $49,999 est. value
Atlanta, College Park, GA 30349

Row Storm Pipe Repair Project
Results
Less than $29,811 est. value
Johns Creek, GA 30097

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Kimball Bridge Median Landscaping Median 1 and 2
Results
Less than $46,142 est. value
Johns Creek, GA 30097

Highway Mowing and Maintenance - Districts 2, 3, 7
Term Contract
Post-Bid

Last Updated 03/13/2020 08:09 AM
Project Title

Green Infrastructure Design Challenge - Continental Colony Elementary

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30331   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Landscaping, Pumps and Wells, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design team to design innovative green solutions that would help reach the City's runoff reduction and water quality goals while demonstrating feasible, constructible projects that can be replicated across neighborhoods. Work will include maximizing infiltration and storage upstream of the lake using green infrastructure and maximize stormwater treatment

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents