Similar Projects
High School 3 Construction
New Construction
Conception
Tomball, TX

New Intermediate School
New Construction
Conception
Tomball, TX

Cy-Fair Multi Campus
New Construction
Design
Houston, TX

McDonald Junior High School Addition
Addition
Design
$20,876,963 est. value
Katy, TX 77449

High School 12 project
New Construction - 499,295 SF
Post-Bid
Houston, TX 77000

KHS/KPHS New Entry, Gymnasium and CTE Addition - Base
New Construction, Addition
Post-Bid
$21,000,000 est. value
Kingwood, TX 77339

Construction Services for Green Center Renovation
Renovation
Results
Less than $3,440,000 est. value
TX

Holbrook and Post Elementary School and Kahla Middle School Renovations
Renovation
Results
Less than $5,100,000 est. value
Houston, TX 77084

Construction Manager at Risk for System Upgrades and Renovations to Spring Woods High School
Renovation
Construction
Less than $25,000,000 est. value
Houston, TX

Construction Manager at Risk for Memorial High School Additions and Renovations
Renovation, Addition - 140,000 SF
Construction
$83,000,000 est. value
Houston, TX 77024

Awty Student Center Phase 2
New Construction
Pending Verification
$14,000,000 est. value
Houston, TX 77055

Yes Prep School
New Construction, Infrastructure - 89,900 SF
Pending Verification
$21,900,000 CJ est. value
Houston, TX 77090

Tomball Junior & High School Renovations
Renovation
Conception
Tomball, TX 77375

St. Peter the Apostle Catholic School
Renovation - 34,258 SF
Design
$9,200,000 est. value
Houston, TX 77021

KHS/KPHS New Entry, Gymnasium and CTE Addition - Alternate
New Construction, Addition
Post-Bid
$21,000,000 est. value
Kingwood, TX 77339

Last Updated 08/30/2022 05:31 PM
Project Title

Northbrook High School and Spring Woods Middle School Cooler Freezer Project

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated budget for Northbrook High School is $350,000 and for Spring Woods Middle School it is $300,000. Northbrook High School and Spring Woods Middle School Cooler Freezer Project References are due today, 7/21/2022 by end of day.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents