Similar Projects
Mill and Overlay, Right-of-Way Fence Replacement
Infrastructure
Bidding

Chip Sealing, Overlay
Infrastructure
Bidding

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Chip Sealing
Infrastructure
Bidding

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

District 3 Crack Seal
Infrastructure
Results

Crack Seal
Infrastructure
Results

District 1 Crack Seal
Infrastructure
Results

WY Flap 407(1) Kortes Road
Term Contract
Results
Alcova, WY

Grading, Concrete Slab Replacement, Bridge Rehabilitation, Temporary Concrete Barrier and Miscellaneous
Infrastructure
Results
WY

Last Updated 03/21/2022 07:04 AM
Project Title

District 2 Chip Seal

Physical Address View project details and contacts
City, State (County) (Carbon, Goshen, Natrona, Sweetwater Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bituminous surfacing, chip seal, traffic control and miscellaneous work at various locations in Transportation District 2 in Carbon, Goshen, Natrona & Sweetwater Counties. Scp-Tc-b222013: 5 - Roadway Description: # Item Description Quantity Unit 1 109.04000 Force Account Work 1,000.000 $$ 2 109.08000 Mobilization 1.000 Ls 3 215.01000 Contractor Storm Water Control 1.000 Ls 4 409.02100 Fog Seal 8.000 Ton 5 409.03070 Chip Seal 216,000.000 Sy 6 409.03085 Emulsified Asphalt Modified 370.000 Ton 7 703.03100 Flagging 300.000 Hr 8 703.03110 Temporary Traffic Control 1.000 Ls Scp-b222033: 5 - Roadway Description: # Item Description Quantity Unit 9 109.04000 Force Account Work 1,000.000 $$ 10 109.08000 Mobilization 1.000 Ls 11 215.01000 Contractor Storm Water Control 1.000 Ls 12 409.02100 Fog Seal 1.000 Ton 13 409.03070 Chip Seal 209,000.000 Sy 14 409.03085 Emulsified Asphalt Modified 355.000 Ton 15 703.03100 Flagging 250.000 Hr 16 703.03110 Temporary Traffic Control 1.000 Ls

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents