Similar Projects
Last Updated | 08/24/2020 03:49 PM |
Project Title | Data Center Upgrades Task 6, Thurgood Marshall Federal Judiciary Building (TMFJB) |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC (District of Columbia County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | General Description of Scope of Services: The current TMFJB Judicial Data Center infrastructure is nearing the end of its life cycle for the major components, which was designed prior to the building’s occupancy in 1992. With IT equipment reducing in size and production equipment moving out of the building to private data center farms the JDC will only house core infrastructure and lab equipment in the future. The existing data center has an 18” high raised access floor and drop in ceiling. The successful bidder will provide construction services to provide a phased upgrade of the existing TMFJB Data Center Space located on the concourse level. The Contractor Shall: Demolition of existing TMFJB Judicial Data Center. Construction of new Judicial Data Center including mechanical, electrical, telecommunications, furniture, furnishings and equipment (FF&E). Phasing of server migration to be completed over weekends and outside normal working hours. Phased demolition of the existing electrical and telecommunications systems servicing the existing data center racks. Phased installation of the new electrical and telecommunications systems servicing the relocated data center racks. Installation of new overhead ladder type cable management system. Installation of new walls, ceilings, finishes, carpet, base, etc. Installation of a new pre-action fire suppression system. Demolition of the existing lighting fixtures and installation of new light fixtures at the completion of the data center upgrade. Demolition of the existing mechanical systems serving the data center and the provision of temporary cooling units for the duration of the new mechanical system installation. Installation of new mechanical systems and removal of the temporary mechanical units. Start-up and commissioning of new mechanical systems. Provision of training for new mechanical systems. Completion of project operations and maintenance manuals and project closeout. All work will be performed at night. Base Bid: The base bid includes construction and relocation of the Judicial Data Center with a warm lit shell for the areas to contain Options 3 and 4. Option 3: Option 3 includes the construction of the Digital Forensics Lab beyond the base bid scope. Option 4: Option 4 includes the construction of the Special Operations Center (SOC) Watch Floor beyond the base bid scope. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |