Similar Projects
Purchase of Flygt Model NP-3301.185 14 Volute Submersible Pump
Alteration
Bidding
Vestal, NY

Reconstruct Well House No. 2 and 4
New Construction
Bidding
Suffern, NY 10901

Settled WasteWater Pump and Motor 2 Rehabilitation at Bird Island Treatment Facility
Post-Bid
Buffalo, NY 14202

Furnish Hidrostahl Submersible Pump at Thomas Creek Pump Station
Post-Bid
Fairport, NY 14614

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Fire Pump Base Replacement
Results
Comstock, NY 12821

Pumps Furnish and Deliver Submersible Non-Clog Pumps Cornell 6NHTA or Approved Equal
Term Contract
Bidding
NY

Installation of Well Pump Well 2
Post-Bid
Beacon, NY 12508

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Water District No. 2, Well No. 5
Infrastructure
Bidding
Pawling, NY

Sewage Pumps
Post-Bid
Cortlandt Manor, NY 10567

New York State Office of Mental Health, Hutchings Psychiatric Center, Site Manhole Sump Pump Replacement
Results
Syracuse, NY 13210

Furnish Metro-Seps Pump Motor Rehabilitation as Specified
Term Contract
Bidding
Syracuse, NY 13204

Repair WEMCO Pump
Post-Bid
White Plains, NY 10601

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Last Updated 06/29/2021 10:28 AM
Project Title

Well F-8 Improvements Project

Physical Address View project details and contacts
City, State (County) Fallsburg, NY   (Sullivan County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following: Furnish and install one submersible well pump including all interconnecting piping, power and controls, wiring, programming and any necessary appurtenances required for complete installation. Furnish and install approximately 180 LF of buried 6” ductile iron pipe connecting the new production Well F-8 to existing F-7 Well House. Furnish and install all ductile iron process piping, valves, instruments, and appurtenances necessary to connect the new buried piping to the existing system within Well House F-7.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents