Similar Projects
Installation of Modular Classrooms
Post-Bid
Less than $3,000,000 est. value
Hopkinton, MA 01748

Installation of Modular Classrooms at Elmwood and Hopkins Elementary Schools
Post-Bid
Hopkinton, MA 01748

Revitalization of The Lincoln School - Filed Sub Bids
Results
Less than $76,000,000 est. value
Lincoln, MA

Wayland High School Athletic Field Buildings Improvements - General Bids
Results
Less than $1,000,000 est. value
Wayland, MA 01778

Modular Classroom Buildings at the Paul P. Gates Elementary School
Post-Bid
Acton, MA 01720

David Mindess Elementary School Project Management Services
Results
$50,000 to $70,000 est. value
Ashland, MA

Construction Management Services for the New David Mindess Elementary School Project
New Construction - 104,885 SF
Post-Bid
Less than $67,300,000 est. value
Ashland, MA 01721

Elementary Schools Project Management
Results
Watertown, MA 02472

New Elementary School
New Construction
Results
Acton, MA

Cunniff and Hosmer Elementary Schools - Filed Sub Bids
New Construction - 224,355 SF
Results
$97,065,055 est. value
Watertown, MA 02472

Philips School Limited Renovation Project - General Bids
Results
$600,000 est. value
Watertown, MA

Construction and Install of Modular Building
Results
Less than $1,143,000 est. value
Reading, MA 01867

Roof Replacement, Accessibility Upgrades and Associated Work at the Greenwood School - General Bids
Renovation
Results
$1,075,000 to $1,125,000 est. value
Wakefield, MA

Tewksbury Elementary School - Filed Sub Bids
New Construction - 140,000 SF
Results
Less than $77,500,000 est. value
Tewksbury, MA 01876

Morse School Roof Replacement
Renovation
Results
$2,200,000 est. value
Cambridge, MA 02139

Last Updated 08/26/2020 08:26 AM
Project Title

Cunniff and Hosmer Elementary Schools - General Bids

Physical Address View project details and contacts
City, State (County) Watertown, MA   (Middlesex County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $97,565,055
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate The construction of two (2) new 143,250 sf and 81,105 sf elementary school buildings. The project will include the filed sub-bid categories of: Masonry, Misc. Iron, Waterproofing, Roofing & Flashing, Metal Windows, Glass & Glazing, Acoustical Tile, Resilient Floors, Painting, Elevators, Fire Protection, Plumbing, HVAC, and Electrical.

Details

,, 224,355 SF - 1 Elementary School, 143,250 SF New Construction, 2 Elementary School, 81,105 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents