Similar Projects
104th Avenue - South Platte River To Highway 85 Widening - City of Commerce City
Infrastructure
Conception
$6,916,000 CJ est. value
Commerce City, CO 80603

The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

Flying Circle Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Dacono, CO 80514

37th Street Widening Phase 1
Infrastructure
Bidding
$4,000,000 CJ est. value
Evans, CO 80620

2022 Storm Jetting
Infrastructure
Bidding
$400,000 CJ est. value
Evans, CO 80620

Equipment Pre-Selection Central Wastewater Treatment Plan Project: Johnstown
Infrastructure
Post-Bid
Johnstown, CO

Construction Manager at Risk - Northglenn WWTP Odor Mitigation Project
New Construction
Post-Bid
$300,000 est. value
Brighton, CO 80603

UC Site Improvements
Infrastructure
Results
$350,000 est. value
Greeley, CO

Great Western Trail Connection
Infrastructure
Results
$621,829 CJ est. value
Severance, CO 80550

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Greeley Apartment / HP Site
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Greeley, CO 80634

New Construction, Additions, and Renovations - 2022 Bond - Weld RE-4 School District
New Construction, Renovation, Infrastructure
Pending Verification
$271,000,000 CJ est. value
Greeley, CO 80631

Cutting Edge Steel
Addition, Demolition, Infrastructure - 9,000 SF
Design
$5,000,000 CJ est. value
Dacono, CO 80514

Water Service Line Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Greeley, CO 80634

Last Updated 12/08/2022 06:02 PM
Project Title

RFP Construction Manager at Risk - Water Treatment Plant Expansion - CMAR Design Phase Services

Physical Address View project details and contacts
City, State (County) Johnstown, CO 80534   (Weld County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Johnstown (Town) is requesting proposals (RFP) from Construction Manager at Risk (CMAR) firms to provide design phase and potentially construction phase services for the Water Treatment Plant (WTP) Expansion Project (Project) design phase services. The Town is currently in the 30% design phase of a WTP expansion project. The existing WTP is Dissolved Air Flotation (DAF) pretreatment followed by Conventional Filtration with a Granular Activate Carbon vessels as a polishing step rated for 6.2 MGD. The facility will be expanded to 12 MGD with a Pressurized Membrane Filtration, Granular Activated Carbon (GAC) and utilizing the existing DAF pretreatment. Question Acceptance Deadline 11/28/2022 05:00 PM EST

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents