Similar Projects
Aqua Viva Water Treatment Facility Urban Lake Park
New Construction
Conception
Yuma, AZ

Figueroa Ave WPCF Facility Improvements
Renovation
Conception
$61,500,000 est. value
Yuma, AZ 85364

WTP #5
New Construction
Design
$12,228,914 est. value
Buckeye, AZ

WTF #9
New Construction
Design
$6,190,000 est. value
Buckeye, AZ

Neely WRP Facility Rehabilitation
Post-Bid
Gilbert, AZ 85233

Granular Activated Carbon Media
Post-Bid
Tucson, AZ 85704

Waste Water Treatment
Results
Luke Air Force Base, AZ 85309

Citywide Water Resources Water Treatment
Term Contract
Results
Less than $15,000,000 est. value
Scottsdale, AZ 85258

Water Treatment Plant Improvements
Renovation
Conception
$1,782,500 est. value
Lake Havasu City, AZ

Sun Leisure Estates Water Treatment System Operation and Maintenance Services
Term Contract
Post-Bid
Yuma, AZ 85364

Union Hills Water Treatment Plant Rehabilitation 2020 CMAR
Results
Phoenix, AZ 85024

Y--GRCA 229035 - Phantom Ranch WWTP - St Improvements
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value

Northwest Water Reclamation Plant (NWWRP) Process Improvements
Results
$28,600,000 est. value
Mesa, AZ 85201

Construction Manager at Risk Project at NWTP South Reservoir Water Quality Improvements
Post-Bid
Gilbert, AZ 85234

Beardsley Water Reclamation Facility Expansion (Design-Build)
Results
Less than $29,100,000 est. value
Peoria, AZ 85345

Reported 09/17/2021 12:00 AM
Project Title

Villa Grande Water Treatment Plant Improvement Plans (Project)

Physical Address View project details and contacts
City, State (County) Eloy, AZ 85131   (Pinal County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to: Sawcut and remove existing pavement, install asphalt edge, onsite driveway improvements, furnish and install concrete pad, aluminum shade cover, electric and controls, install OWNER-supplied AdEdge Nitrate Treatment System, excavate two new ponds, install berms, furnish and install and anchor new HDPE liner. Furnish and install new 30,000-gallon steel tank, relocate, and reconnect chemical injection shed, install appx 500-feet of 2-inch and 3-inch PVC pipe and related appurtenances, connect to existing manifold, rotate existing well and connect to existing manifold, remove existing fence and return to OWNER. Install new 6’ chain link fencing and gate, miscellaneous tie-ins, and all appurtenances.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents