Similar Projects
Fire Pumps and DW Pumps Maintenance and Repair
Term Contract
Bidding
Atlanta, GA 30303

Buddy Spann Park Well No. 5 (105)
Bidding
Hazlehurst, GA

Contract A - Well and Chemical Feed Building
Post-Bid
Fort Valley, GA 31030

One Portable Diesel Pump
Post-Bid
Valdosta, GA 31603

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Pond Springs Road Test Well with Production Option
Results
Chickamauga, GA

New 30,000 Gallon Draft Pit
Bidding
Valdosta, GA 31606

Well Maintenance
Term Contract
Post-Bid
Savannah, GA 31401

Primary Chill Water Pumps Replacement
Results
Savannah, GA

Bypass Pump Station And Force Main Alternate Route
Bidding
GA

Wet Well Cleaning and Disposal
Term Contract
Post-Bid
Gainesville, GA 30501

Effluent Pump Station Pump Replacement
Results
Less than $100,000 est. value
Camilla, GA 31730

Harbins Park Well Services
Post-Bid
Dacula, GA 30019

FY20 - New Flygt Pump for Wastewater Treatment Plant
Results
Douglas, GA 31533

2020 Water System Improvements - Andrews Well 2
Post-Bid
Carnesville, GA 30521

Last Updated 02/26/2020 09:03 AM
Project Title

Wastewater Flow Measurement Stations

Physical Address View project details and contacts
City, State (County) Covington, GA 30016   (Newton County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following: furnishing all labor, equipment, materials and products and performing all project coordination necessary to install three wastewater flow measurement stations. Construction includes: Clear and grading sites Install stormwater piping and outlet structures Install erosion and sedimentation measures Install chain link fence and gates Install gravel driveways Install gravity sewer piping and manholes Install metering manholes with parshall flumes and LaserFlow equipment Install aluminum platforms with foundations Install flow measurement instrumentation and controls, SCADA, lighting, and associated electrical components Connect to nearest power supply at each site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents