Similar Projects
Twin Sludge Force Main Rehabilitation
Infrastructure
Bidding
$13,000,000 to $14,000,000 est. value
Mamaroneck, New Rochelle, NY 10801

SMD-Materials-Pipe, Sewer Tools
Alteration
Bidding
Bronx, Brooklyn, New York, Queens, Staten Island, NY

Sewer Material for the Department of Public Utilities
Term Contract
Post-Bid
Troy, NY

Y1DA--528A8-19-851 Replace Main Kitchen Grease Trap
Post-Bid
$25,000 to $100,000 est. value
Albany, NY 12208

CM Services - Riverfront Pump Station
Term Contract
Results
Albany, NY 12242

Hagan Town Pump Station Abandonment and Replacement
Results
$543,288 est. value
Poughkeepsie, NY 12603

Borden Avenue Pump Station Upgrade
New Construction
Bidding
$22,525,000 to $30,475,000 est. value
Long Island City, NY

Pumping Septic Tanks
Term Contract
Post-Bid
Holmes, Pawling, NY 12564

Sleepy Hollow Water District Improvements and Extension No 1
Results
Chittenango, NY 13037

Pumping Station Rehabilitation - Crotonville Pumping Station
Renovation
Bidding
$8,200,000 to $9,000,000 est. value
Ossining, NY 10562

Sanitary Sewer Repairs
Post-Bid
Mayville, NY 14757

Feeder Street Gravity Sewer Rehabilitation
Results
Fort Edward, NY 12828

CVMF Complex Storm and Sanitary Sewer Improvements
Infrastructure
Bidding
$379,000 est. value
Rochester, NY 14606

Harriman Farms Pump Station Replacement
Post-Bid
Harriman, NY 10926

Phase 9 Sewer and Manhole Rehabilitation
Results
Tonawanda, NY 14150

Last Updated 10/15/2021 09:24 AM
Project Title

Fairgrounds Improvement Project

Physical Address View project details and contacts
City, State (County) New Paltz, NY 12561   (Ulster County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the completion of several improvement projects at the Ulster County Fairgrounds. The improvements will be made to the sanitary sewer and campground area. To provide separate costs for each of the three construction areas, the North RV Parking Area, the South Camper RV Area, and the Sand Bed Chlorination Area project. The following is a brief description of the project work items in three areas of the Fairgrounds, i.e., the North, South, and the Sand Bed areas. Furnish and install a complete and functional sanitary pump station and electric service in the North RV Parking Area. Furnish and install a new lid, pumps, rails, and controls with panel for the existing ticket booth sanitary pump station in the North Area. Furnish and install three (3) sanitary sewage dump stations with water supply spigots in the North RV Parking Area. Furnish and install one new five-thousand-gallon septic tank in the North RV Parking Area. Remove existing utility poles and trees as indicated in the South Camper Area. Furnish and install new electric service and associated panel boards in the South Camper Area per plan. Furnish and install electric service connections to individual South Camper RV sites per plan. Furnish and install new wood guide rail along camper divider in South Area per plan. Furnish and install water and sewer stubs to individual RV sites in South Area per plan. Furnish and install new gravity sanitary sewer and two (2) manholes to connect to existing sanitary sewer manhole in South Area. Furnish and install new polyethylene water line from existing water vault to campground services in South Area. Furnish and install new stone access road for Sand Bed Area. Furnish and install new 1,500-gallon chlorine contact tank with tablet chlorinator in the Sand Bed Area. Furnish and install new tablet chlorination unit in existing vault in the Sand Bed Area. Furnish and install all sanitary sewer piping and associated restoration to the Sand Bed Area. Furnish and install all required piping for gravity and forced sanitary, and domestic water supply in bedded trenches. Backfill, compact, and restore grass and asphalt areas. Furnish and install all conduit, conductors, j-boxes, fittings, strut, and connectors, etc. as required for pump, control, camper hook-ups, etc., for all line and low voltage power requirements.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents