Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Camarillo Hills Drain Replacement at Ventura Boulevard - SD-5052 - City of Camarillo
Infrastructure
Design
Less than $12,760,000 est. value
Camarillo, CA 93011

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Proposed Grayson Repowering Demolition and Site Improvement
Demolition, Infrastructure
Bidding
Gardena, CA

Arcata Storage Tank-1C Project
Infrastructure
Bidding
$2,200,000 to $2,700,000 est. value
Arcata, CA 95521

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

SF State Science Replacement Building - Earthwork
Infrastructure
Results
San Francisco, CA

Roadway Excavation, HMA (Type A), Culvert Work and RSP
Infrastructure
Results
$4,860,000 est. value
CA

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

MPA Route 140 Pavement Preservation
Alteration
Design
$24,126,000 est. value
Mariposa, CA 95338

Hog Fire Stewardship - Eagle Lake Field Office
Infrastructure
Bidding
Susanville, CA 96130

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

Last Updated 07/05/2022 03:21 PM
Project Title

Solid Waste Organics Diversion - City of Brentwood

Physical Address View project details and contacts
City, State (County) Brentwood, CA 94513   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $30,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

n order to comply with regulatory requirements associated with the passage of AB1826 and SB1383, the City will be required to recycle organic wastes and divert them away from landfills. In particular, SB1383 requires a 75% reduction in the disposal of organic waste by 2025. The project is included in the City of Brentwood's FY 2021/2022-2025/2026 Capital Improvement Program (CIP). Per the owner, as of July 1, 2022, no construction project has been identified with this project and they are not sure there will be. The owner states that they do not have a design team, general contractor or timeline of construction for this project. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents