Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Full Service Design IDIQ
New Construction
Design

2021-2022 Contract Services Annual Notice and Instructions
Infrastructure
Bidding
Phoenix, AZ

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Architect-Engineer Indefinite Delivery/Indefinite Quantity Contract For the States Covered by EPA Regions 1 through 4
Post-Bid
Less than $40,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

IDIQ Contract for A-E Services for Architectural and Engineering Work for Oil Management, Waste/Hazardous Material
Post-Bid
Less than $75,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Rainbow Valley Water Reclamation Facility Expansion
Addition
Bidding
Goodyear, AZ

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

IDC A-E Services for Horizontal Design Needs Primarily for Department of Homeland Security Nationwide
New Construction, Renovation
Results
Less than $65,000,000 est. value

C--A&E Services LC Region
Term Contract
Bidding
Glendale, Yuma, AZ - Boulder City, NV

Reported 12/14/2021 12:00 AM
Project Title

District Two Police Station and Jail Renovation and Addition

Physical Address View project details and contacts
City, State (County) Scottsdale, AZ 85251   (Maricopa County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: Design phase services may include the following: Review existing planning and programming documents and develop the final space program. Prepare schematic, design and construction documents. Compile and evaluate existing information including utility maps for the project. Perform all necessary field survey work to prepare the preliminary designs, architectural and engineering plans and specifications for the project. Prepare and submit the necessary design of the project in accordance with the City of Scottsdale Design Standards and Policy Manual. Design the project to the City of Scottsdale’s sustainability and green building goals. The original facility is part of the iconic Civic Center Mall as designed by Bennie Gonzales. Considerable public input is anticipated. The design team will attend and prepare presentation materials for public meetings. Obtain Development Review Board (DRB) approval and City permits Perform all the necessary coordination with utility companies. Manage the preparation of construction documents, special provisions, drainage reports, geotechnical reports and other documents as required. Prepare cost estimates throughout the design phase of the project. Provide value engineering input as needed. Incorporate the owner’s sensitivity to quality, safety, and environmental factors. Consider the incorporation of Low Impact Development goals in the management of storm water. Assist with Construction Manager at Risk preparation of Guaranteed Maximum Price(s). Construction phase services may include the following: Shop drawing and submittal review. Site visits and coordination with the general contractor as required. Attendance at the weekly construction meetings. Request for Information review and response. Issuing ASI’s as required MP&E site inspections that may be required for sustainability goals and/or commissioning and Final Punch list documentation Issue Certificate of Substantial Completion.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents