Similar Projects
Power Plant Building Office Entrance - City of Ames
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Ames, IA 50010

2021/22 Storm Water Facility Rehabilitation - City of Ames
Infrastructure
Conception
$150,000 CJ est. value
Ames, IA 50010

Lime Lagoon Improvements - City of Ames
New Construction, Infrastructure
Design
$1,353,000 CJ est. value
Ames, IA 50010

2025/26 Cyride Facility Improvements - Addition to New/Existing Facility - City of Ames
Addition, New Construction, Infrastructure
Design
$750,000 CJ est. value
Ames, IA 50011

RFP - Ames Industrial Park Development
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Ames, IA 50010

Test Drilling at North River Valley
Infrastructure
Post-Bid
$50,000 est. value
Ames, IA

PCC Patching
Infrastructure
Results

South 16th Street Improvements
Infrastructure
Results
$3,835,811 est. value
Ames, IA 50010

Nutrient Reduction Modifications - Phase 2 - City of Ames
New Construction, Infrastructure
Conception
$14,260,000 CJ est. value
Ames, IA 50010

Concrete Repairs at Athletics Locations
Infrastructure
Post-Bid
$80,000 CJ est. value
Ames, IA 50010

2021/22 Concrete Pavement Improvement ( South Kellogg Avenue and 2nd Street)
Infrastructure
Results
$1,031,585 est. value
Ames, IA 50010

CyRide Building Water Main Replacement - City of Ames
Renovation, Infrastructure
Conception
$750,000 CJ est. value
Ames, IA 50011

Electric Services Department Public Improvement Project
Infrastructure
Post-Bid
$225,000 CJ est. value
Ames, IA 50010

2021/22 Downtown Street Pavement Improvements, Alley (Duff Avenue to Sherman Avenue)
Infrastructure
Results
$154,256 est. value
Ames, IA 50010

Clear Creek Bank Stabilization (North of Oakland Street) - City of Ames
Infrastructure
Conception
$630,000 CJ est. value
Ames, IA 50014

Last Updated 06/20/2023 02:00 PM
Project Title

2021/22 Collector Street Pavement Improvements - Hoover Avenue - City of Ames

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is the annual program for reconstruction or rehabilitation of collector streets. Locations are chosen in accordance with the most current street condition inventory. The 2021/22 scope includes Hoover Avenue (24th Street to Top-O-Hollow Road). The Hoover Avenue project in FY 2021/22 will include Long Range Transportation Plan bicycle projects “ON 4” and “OFF 23” ($10,000). The project is included in the city's 2021-2026 Capital Improvement Program (CIP). As of August 20, 2021, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of June 7, 2023, no new information available

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents