Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

Wastewater Pump Station Improvements
Design
North Bay Village, FL

Wastewater Pump Station Improvements
Renovation
Bidding
North Bay Village, FL 33141

Lift Station S-26 Replacement
New Construction
Bidding
$947,921 est. value
Satellite Beach, FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Cooper Creek Lift Station Relocation
Renovation
Construction
$1,200,000 est. value
University Park, FL 34201

Cedar Bay District II Pump Stations and Flow Rerouting Project - Robena Road
Construction
Jacksonville, FL 32218

Lift Station M-16 Replacement
New Construction
Bidding
FL

Continuing Contracts for Construction Manager at-Risk Services
Post-Bid
Plant City, FL

Water Booster Station #1
Results
Gretna, FL

Bridgeford Oaks Lift Station Rehabilitation
Construction
$225,000 est. value
Tampa, FL 33637

Lift Station 1 Rehabilitation
Renovation
Bidding
Trenton, FL

Reported 02/10/2022 02:47 PM
Project Title

Lift Station Pump Replacement and Rehabilitation for the Southwest Florida International Airport

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33913   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install all materials, shop drawings, equipment, tools, services and incidentals reasonably inferable and necessary for the proper rehabilitation of the lift station. The scope of work consists of replacing two (2) 4” submersible pumps and performing lift station rehabilitation including but not limited to installation, testing and start-up of two new submersible pumps and replacement of discharge piping, fittings, values, guide rails, and related work. Provide (2) submersible pumps with non clog mono vane impeller style pumps equipped with quick disconnect power cable assemblies. 1. Sulzer ABS Model # XFP100E-CB1.4-PE75/4-E 2. Wilo EMU Model # FA 10.33E T 17-4/16KEx 3. Flygt Model # 3127.180, 484

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents