Similar Projects
Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

Laird Avenue - 14th Street to Apache Avenue - City of Hastings
Infrastructure
Conception
$270,000 CJ est. value
Hastings, NE 68901

Runway and Taxiway - Fremont Municipal Airport
Infrastructure
Design
$7,300,000 CJ est. value
Fremont, NE 68025

Runway and Taxiway - Fremont Municipal Airport
Infrastructure
Design
$7,300,000 CJ est. value
Fremont, NE 68025

Emergency Road Repair Services
Infrastructure
Bidding
$700,000 CJ est. value
Butte, NE 68722

Emergency Road Repair Services
Infrastructure
Bidding
$700,000 CJ est. value
Butte, NE 68722

Bituminous - US-20, Crawford West
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Crawford, NE 69339

Bituminous - US-20, Crawford West
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Crawford, NE 69339

Alta Collina Storm Sewer and Paving - Phase I
Infrastructure
Results
Omaha, NE

Gruenther Ridge Paving - Phase I
Infrastructure
Results
$1,701,400 est. value
Omaha, NE

Heartwell Renewables Diesel Production Plant
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Hastings, NE 68901

Lexington Veterans Pavilion at Kirkpatrick Memorial Park
Infrastructure
Construction
$1,160,000 CJ est. value
Lexington, NE 68850

David City Wastewater Treatment Plant (WWTP)
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
David City, NE 68632

County Road H - Burt County
Infrastructure
Pending Verification
$1,334,000 CJ est. value
Oakland, NE 68045

Conversion from 2400/4160Y to 7970/13800Y Cedar to 6th Avenue, BNSFRR to B Street - City of Hastings
Infrastructure
Conception
$600,000 CJ est. value
Hastings, NE 68901

Last Updated 07/24/2023 04:18 PM
Project Title

Valentine Maintenance Facility

Physical Address View project details and contacts
City, State (County) Valentine, NE 69201   (Cherry County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 9, 2023, the project has been awarded, however, a contract award amount and a timeline for construction has not been confirmed. In general, Work consists of constructing a new maintenance facility of approximately 29,000 square feet, containing NDOT offices, Nebraska State Patrol offices, crew and trooper rooms, restrooms, heated equipment storage bays, cold storage bay, wash bay, mechanics bays and office, parts/tool storage, and mezzanine storage at a new maintenance yard located in Valentine, NE. Construction is to be primarily a fully insulated pre-engineered metal building system. Non-load bearing metal stud framing is to be used for interior wall framing. Additional building components will include concrete footings & curbs, structural steel, polished concrete floors, metal roof, sectional doors, pre-finished aluminum hanger rod canopy, hollow metal and stainless steel doors and frames, aluminum windows, casework, ceramic tile and painted finishes, acoustical tile ceilings, and mechanical, electrical, and plumbing installation. Site work includes grading, paving, parking, sidewalks, fuel island, propane tanks, sanitary force main with lift station, utilities, and perimeter fencing. Each Bidder must submit with the bid a certified or cashiers check or a bid bond on AIA form A310 in an amount equal to five (5%) of the bid. The character and amount of security must be submitted by the Contractor for the performance of the Contract is stated in the proposed contract documents. Bidders may not withdraw their bids for a period of at least sixty (60) days after the scheduled closing time for the receipt of the bids. The State of Nebraska, Department of Transportation reserves the right to reject any or all bids and re-advertise for Bids; reserves the right to waive informalities and irregularities and to make awards on bids which furnish the materials and construction that will in their opinion serve the best interests of the State. NEDOT - Valentine Maintenance Facility

Details

29,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents