Last Updated 11/14/2019 11:02 PM
Project Title

Northeast Campus - Utility Expansion

Physical Address View project details and contacts
City, State (County) Auburn, AL 36849   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of the work includes but is not limited to: Project consists of the installation and connection of campus utilities from approximately Ross Square on the AU campus to the entrance of Cambridge Residence Hall along Thach Avenue. These utilities and scope of work include, but are not limited to, hot water/chilled water distribution, electrical primary/secondary distribution, sanitary/storm sewer relocation, water service relocation, gas relocation, new traffic signal, and roadway/streetscape improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents