Similar Projects
Last Updated | 03/03/2023 06:31 AM |
Project Title | I-90/Price Creek Vic to Cabin Creek I/C Phase 4 - Add Lanes/Wildlife Bridges |
Physical Address | View project details and contacts |
City, State (County) | Cle Elum, WA 98922 (Kittitas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected March 2025 |
Bids Due | View project details and contacts |
Estimated Value | $202,620,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | STIP ID 509094A19 The original concrete pavement on this section of I-90 east of Snoqualmie Pass is severely deteriorated and needs to be replaced. Existing low clearance bridges over the highway create hazards for oversized loads. Drivers also experience stop-and-go traffic conditions due to increasing traffic volumes and collisions, including collisions with wildlife. This project will reconstruct I-90 on a new alignment and add a third lane in each direction to add capacity, improve sight distance, provide a smoother ride, replace rapidly deteriorating pavement, and increase vertical clearance for oversized loads. The project will also construct new wildlife crossings to improve habitat connectivity and reduce collisions with wildlife. Construct six lanes and wildlife bridges on new alignment. The original concrete pavement on this section of I-90 east of Snoqualmie Pass is severely deteriorated and needs to be replaced. Existing low clearance bridges over the highway create hazards for oversized loads. Drivers also experience stop-and-go traffic conditions due to increasing traffic volumes and collisions, including collisions with wildlife. This project will reconstruct I-90 on a new alignment and add a third lane in each direction to add capacity, improve sight distance, provide a smoother ride, replace rapidly deteriorating pavement, and increase vertical clearance for oversized loads. The project will also construct new wildlife crossings to improve habitat connectivity and reduce collisions with wildlife. RW phase will be done under PIN 509017A. As of March 03, 2023, this project is in design status. Preliminary engineering has begun and environmental design is expected to be completed in the second quarter of 2020. The contract advertisement is expected in First quarter of 2025 and construction is anticipated to be operationally complete in the Fourth quarter of 2028. WSDOT - I-90/Price Creek Vic to Cabin Creek I/C Phase 4 - Add Lanes/Wildlife Bridges *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |