Similar Projects
SR 903/Ronald Vicinity - Culvert Lining
Infrastructure
Conception
$734,000 CJ est. value
Cle Elum, WA 98922

SR 906/Hyak Rd I/S vicinity - Replace Culvert
Infrastructure
Conception
$1,890,000 CJ est. value
Snoqualmie Pass, WA 98068

Hospital Site Improvements
Infrastructure
Design
$1,570,000 CJ est. value
Ellensburg, WA 98926

I-90/Peoh Road Bridge EB - Deck Rehabilitation
Infrastructure, Renovation
Design
$6,410,000 CJ est. value
Cle Elum, WA 98922

East First Avenue Improvements
Infrastructure
Post-Bid
Cle Elum, WA 98922

RFQ Contractor - Cle Elum Dam Fish Passage Facility Adult Facility, Yakima River Basin Water Enhancement
Infrastructure
Post-Bid
$55,000,000 CJ est. value
Cle Elum, WA 98922

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Helena Complete Streets Improvements
Infrastructure
Results
Ellensburg, WA 98926

Stafford Avenue Corridor Improvements - City of Cle Elum
Infrastructure
Conception
$765,000 CJ est. value
Cle Elum, WA 98922

I-90/West Side Canal Bridge EB - Deck Rehabilitation
Infrastructure, Renovation
Design
$637,000 CJ est. value
Cle Elum, WA 98922

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

I-82/Columbia River Bridge EB - Special Repairs
Infrastructure
Design
$1,079,000 CJ est. value
Ellensburg, WA 98926

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

City Safety Improvements
Infrastructure
Results
$115,250 est. value
Cle Elum, WA

Last Updated 03/03/2023 06:31 AM
Project Title

I-90/Price Creek Vic to Cabin Creek I/C Phase 4 - Add Lanes/Wildlife Bridges

Physical Address View project details and contacts
City, State (County) Cle Elum, WA 98922   (Kittitas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $202,620,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID 509094A19 The original concrete pavement on this section of I-90 east of Snoqualmie Pass is severely deteriorated and needs to be replaced. Existing low clearance bridges over the highway create hazards for oversized loads. Drivers also experience stop-and-go traffic conditions due to increasing traffic volumes and collisions, including collisions with wildlife. This project will reconstruct I-90 on a new alignment and add a third lane in each direction to add capacity, improve sight distance, provide a smoother ride, replace rapidly deteriorating pavement, and increase vertical clearance for oversized loads. The project will also construct new wildlife crossings to improve habitat connectivity and reduce collisions with wildlife. Construct six lanes and wildlife bridges on new alignment. The original concrete pavement on this section of I-90 east of Snoqualmie Pass is severely deteriorated and needs to be replaced. Existing low clearance bridges over the highway create hazards for oversized loads. Drivers also experience stop-and-go traffic conditions due to increasing traffic volumes and collisions, including collisions with wildlife. This project will reconstruct I-90 on a new alignment and add a third lane in each direction to add capacity, improve sight distance, provide a smoother ride, replace rapidly deteriorating pavement, and increase vertical clearance for oversized loads. The project will also construct new wildlife crossings to improve habitat connectivity and reduce collisions with wildlife. RW phase will be done under PIN 509017A. As of March 03, 2023, this project is in design status. Preliminary engineering has begun and environmental design is expected to be completed in the second quarter of 2020. The contract advertisement is expected in First quarter of 2025 and construction is anticipated to be operationally complete in the Fourth quarter of 2028. WSDOT - I-90/Price Creek Vic to Cabin Creek I/C Phase 4 - Add Lanes/Wildlife Bridges *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents