Similar Projects
Pre-Qualification - HVAC Contractors for Housing Office Projects
Bidding
VA

Removal and Replacement of Water Cooling Tower
Bidding
Alexandria, VA 22305

HVAC Repair and Replacement Services
Term Contract
Post-Bid
VA

Aquarium Marine Science Center Condenser Valve, Heater, Various Ductwork and Increased Chilled Water Flow
Post-Bid
Virginia Beach, VA 23451

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

Science Building Lab Exhaust Ductwork Repairs at Lord Fairfax Community College
Results
Middletown, VA

Air Handling Systems Replacement
Bidding
$100,000 to $199,999 est. value
Manassas, VA 20109

C1DA--A-E Upgrade Replace HVAC Phase II (VA-20-00029490)
Post-Bid
$150,000 est. value
Salem, VA 24153

HVAC Repair and Maintenance Services for Various Town Facilities
Results
Purcellville, VA 20132

Rooftop Unit Replacements at Manchester High School
Bidding
$200,000 to $299,999 est. value
Midlothian, VA 23112

Cooling Tower Replacement
Post-Bid
Yorktown, VA

Moores Bridges Water Treatment Plant HVAC Improvements
Results
$3,000,000 est. value
Norfolk, VA 23502

HVAC Service Culpeper District
Term Contract
Bidding

Replacement/Refurbishment Datacenter AHU #1 and #3
Post-Bid
Radford, VA 24143

HVAC Preventative Maintenance
Term Contract
Results
VA

Last Updated 04/07/2021 01:01 PM
Project Title

Jamestown Settlement Education Wing Condenser Replacement at Jamestown Settlement

Physical Address View project details and contacts
City, State (County) Williamsburg, VA 23185   (James City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as the replacement of the existing end of life rooftop condensers with in-kind units. Due to the age and refrigerant type the new units will require replacement of interconnecting refrigerant piping and the direct expansion cooling coil. The project will also include the addition of steel maintenance grating at the existing steel, along with maintenance steps from the roof to the equipment access grating.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents