Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

Middletown Elementary School Chiller Replacement
Results
Middletown, VA 22645

LFCC-M Smith Building Welding Lab HVAC
Results
Middletown, VA

Armstrong SF665DW Heater Replacement Parts
Post-Bid

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Altavista, Bedford, Covington, Lynchburg, Newport News, Onancock, Winchester, Wytheville, VA 24523

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Improvements for Armel Elementary School
Alteration
Results
Winchester, VA 22602

Metro Hanger HVAC
Alteration
Post-Bid
Henrico, VA 23250

HVAC Improvements for Middletown Elementary School
Alteration
Results
Middletown, VA 22645

Exhaust Recovery Systems for the Fire/Rescue Department
Alteration
Post-Bid
Winchester, VA

A.O. Smith LP Gas-Hot Water Heater 100 Gallon-Proprietary
Alteration
Results

Mechanical Contractor(s) and Related Services
Term Contract
Post-Bid
Winchester, VA

35-Ton Rooftop Unit Number 4 Replacement
Alteration
Results
Winchester, VA 22602

Boiler Maintenance and Repair
Term Contract
Results

Reported 04/29/2022 12:00 AM
Project Title

Northwestern Regional Educational Programs HVAC Improvements

Physical Address View project details and contacts
City, State (County) Winchester, VA 22602   (Frederick County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing HVAC equipment at Northwestern Regional Educational Programs (NREP). New HVAC equipment shall include, but not be limited to, new dedicated outside air system (DOAS) units, new outside air and ductwork for DOAS units, new VAV boxes for DOAS units, new fans, etc. Work also includes providing and installing new BAS Controls.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Roof Accessories, Firestopping, Penetration Firestopping, Joint Sealants.
Division 08 - Openings, Access Doors and Panels, Access Doors and Frames.
Division 09 - Finishes, Acoustical Ceilings, Acoustical Panel Ceilings, Painting, Exterior Painting, Interior Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 31 - Earthwork.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents