Similar Projects
(SS2) 2.6 MG Commerce Drive Settling Pond - City of Saint George
Infrastructure
Conception
$2,014,000 CJ est. value
St George, UT 84790

North Conference Pond (DBW13) - City of Layton
Infrastructure
Conception
$450,000 CJ est. value
Layton, UT 84041

HPER Plaza Reroof - Hazardous Material Abatement
Term Contract, Infrastructure
Design
$400,000 CJ est. value
Salt Lake City, UT 84112

RFP Construction Manager - Marina Expansion - Bear Lake State Park - Division of State Parks
Infrastructure
Bidding
$45,000,000 CJ est. value
Garden City, UT 84028

Draper Prison Demolition
Demolition, Infrastructure
Sub-Bidding
$14,000,000 CJ est. value
Draper, UT 84020

WEDU Building Pre-Demolition Hazardous Materials Abatement
Term Contract, Demolition, Infrastructure
Sub-Bidding
$240,000 CJ est. value
St George, UT 84770

Asbestos Abatement Contractors for the Demolition and Removal of Two Natural Gas Steam Boilers
Post-Bid
Logan, UT

Hill AFB Base Integrated Environmental Support Tasks (Biest)
Term Contract
Post-Bid
Hill AFB, UT

CDBG PY21 FY22 Clearance 100 West
Term Contract
Results
Saint George, UT 84770

Asbestos Abatement and Related Services Contract
Term Contract
Results
Farmington, UT

WPAV F and E PDC Work Area Building 522-B - Demolition
Demolition, Infrastructure
Sub-Bidding
$259,726 CJ est. value
Salt Lake City, UT 84132

Environmental Testing
Term Contract
Post-Bid
Hill AFB, UT

DFCM Construction- Utah Department of Corrections Draper Prison Site Hazardous Materials Abatement
Term Contract, Infrastructure
Results
$1,380,524 CJ est. value
Draper, UT 84020

Red Ryder Prescribed Fire Aspen Restoration Cut Pile Burn
Term Contract
Sub-Bidding
Salt Lake City, UT 84111

Meth and Mold Remediation Services
Term Contract
Post-Bid
Fort Duchesne, UT

Last Updated 08/30/2022 04:06 AM
Project Title

DFCM Construction - Utah Tech University Nisson Towers Pre-Demolition HazMat Abatement

Physical Address View project details and contacts
City, State (County) St George, UT 84770   (Washington County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Hazardous Materials Abatement as Outlined in the Site Assessment Report Dated May 3, 2022 by Hill West Environmental on All Work Groups Buildings a (to Include Mechanical Tunnels), B, C & D. Phasing and Individual Work Group Breakdowns to Be Provided on U3p on or Before August 19, 2022 Pending Confirmation With the Cmgc Layton Construction and Dfcm Project Management. Construction Cost Estimate: $750,000.00 Individual Work Group Breakdowns: Work Group A: 215,625.00 Work Group B: 178,125.00 Work Group C: 178,125.00 Work Group D: 178,125.00 Question Submission Close Date 8/26/2022 3:00 PM MDT

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents