Similar Projects
Salt Creek Trail, Eagle Park Phase
Bidding
Nashville, IN

Indianapolis Cultural Trail 2.0
Infrastructure
Bidding
$18,000,000 to $20,000,000 est. value
Indianapolis, IN

Asphalt Repairs
Post-Bid
Angola, IN 46703

Vienna-Finley ES Parking Lot Improvements D/B RFP
Post-Bid
Scottsburg, IN 47170

Bike and Pedestrian Facilities
Results
IN

Curb and Gutter, Sidewalk, and ADA Ramps
Results
Indianapolis, IN 46204

Riverside-Jackson Trail Pedestrian Pathway
Infrastructure
Bidding
Muncie, IN 47307

Sidewalk Installation/Repair on Scattered Site ECHA Properties
Post-Bid
East Chicago, IN 46312

Downtown Streetscape Revitalization
Results
Bremen, IN 46506

Wabash River Heritage Trail
Infrastructure
Bidding
Newport, IN

Recover Forward Sidewalk
Post-Bid
Bloomington, IN 47402

2020 CCMG Paving & Second Street Resurfacing & Sidewalks
Results
$421,951 est. value
Orleans, IN 47452

PA-20-007 Eagle Creek Ornithology Center Entrance and Parking Lot
Infrastructure
Bidding
Less than $100,000 est. value
Indianapolis, IN 46278

South Parking Lot and Entrance Lane Sealcoating
Post-Bid
Indianapolis, IN 46200

Woodstock Drive/Woodstock Court Curb Improvement
Results
Fort Wayne, IN 46802

Last Updated 08/12/2021 02:51 AM
Project Title

ADA Sidewalk and Ramp Construction

Physical Address View project details and contacts
City, State (County) IN   (Blackford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Line Item Code Description Quantity Unit Item No 105-06845 Construction Engineering 1.00 Ls 0001 109-08359 Liquidated Damages 1.00 Dol 0002 109-08360 Contract Liens 1.00 Dol 0003 109-08443 Quality Adjustments, Temporary Traffic Control Devices 1.00 Dol 0004 109-08444 Quality Adjustments, Failed Materials 1.00 Dol 0005 109-11362 Quality Adjustments, Failure To Maintain Temporary Erosion And Sediment Control Measures 1.00 Dol 0006 110-01001 Mobilization And Demobilization 1.00 Ls 0007 205-12108 Stormwater Management Budget 2400.00 Dol 0008 205-12616 Stormwater Management Implementation 1.00 Ls 0009 207-08264 Subgrade Treatment, Type Ii 104.10 Sys 0010 604-06070 Sidewalk, Concrete 721.00 Sys 0011 604-08086 Curb Ramp, Concrete 61.70 Sys 0012 604-12083 Detectable Warning Surfaces 12.80 Sys 0013 610-08446 Pccp For Approaches, 6 In. 104.10 Sys 0014 611-08232 Mailbox Assembly, Reset Single 1.00each 0015 621-01004 Mobilization And Demobilization For Seeding 1.00each 0016 621-06560 Mulched Seeding u 389.80 Sys 0017 801-06640 Construction Sign, a 3.00each 0018 801-06645 Construction Sign, b 96.00each 0019 801-06775 Maintaining Traffic 1.00 Ls 0020 801-07118 Barricade, Iii-a 144.00 Lft 0021 802-05701 Sign Post, Square Type 1 Reinforced Anchor Base 40.50 Lft 0022 802-07060 Sign, Sheet, Relocate 1.00each 0023 802-09838 Sign, Sheet, With Legend, 0.080 In. 24.00 Sft

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents