Similar Projects
Utilities - US 77
Infrastructure
Conception
$1,000,000 est. value
Noble, OK 73068

Hefner Plant R and R - 3827 West Hefner Road (Ward 8) - City of Oklahoma City
Alteration
Conception
$4,250,000 est. value
Oklahoma City, OK 73120

Utilities - US 60
Infrastructure, Alteration
Design
$963,212 est. value
Bluejacket, OK

Utilities - US 81
Infrastructure
Design
Duncan, OK 73575

Air Force Life Cycle Management Center WAG B9201 Project, Tinker AFB
New Construction, Infrastructure - 35,000 SF
Bidding
$25,000,000 CJ est. value
Oklahoma City, OK 73145

Raw Water Pipeline Repair Project
Infrastructure
Bidding
$400,000 est. value
Stillwater, OK

Demolition and Removal of the Old Sheriff's Department
Demolition, Infrastructure
Sub-Bidding
$90,000 CJ est. value
Kingfisher, OK 73750

W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Oklahoma City, OK 73145

Site Preparation Services
Term Contract
Post-Bid
Claremore, OK 74017

1000-1600 Block East Pine Avenue Waterline Relocation
Results
Enid, OK 73701

Wyandotte Nation - Turtle Hill Estates Phase I
Infrastructure, Alteration
Results
Wyandotte, OK

Arterial Resurfacing: SW 29th Street from Council Road to County Line Road
Infrastructure
Conception
$540,000 est. value
Oklahoma City, OK 73195

Utilities - US 70
Infrastructure
Design
$371,000 est. value
Broken Bow, OK

Woodstock Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$759,512 CJ est. value
Broken Arrow, OK 74012

Relocation of 570 LF of 4" and 2" PVC Water Main and 295 LF 4" Bore and Casing and 115 LF 8" Bore and Casing
Infrastructure
Post-Bid
Webbers Falls, OK

Last Updated 07/22/2022 07:05 AM
Project Title

ODOT Water Line Relocation

Physical Address View project details and contacts
City, State (County) Wapanucka, OK 73461   (Johnston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

ODOT Waterline Relocation 18028 L.F. Furnish & Install 2" PVC CL200 Water Main 1403 L.F. Furnish & Install 3" PVC CL200 Water Main 1600 L.F. Directional Bores & Install 2" PE SDR 11 493 L.F. Bore & Install 4" Steel Casing, 0.25" thick 530 L.F. Bore & Install 6" Steel Casing, 0.25" thick 970 L.F. Bore & Install 2" Steel Casing, 0.188" thick 14 Each 2" Gate Valve & Box 4 Each 3" Gage Valve & Box 2 Each 4' Dia. Precast Manhole w/ 2" Gate Valve & 2 (two) 3/4 " Corp Stops and Sampling Taps 16 Each PVC to PE Transition 15 Each Service Connection (relocate meter and reconnect) 1 L. Sum Construction Traffi c Control 1 L. Sum Erosion Control 1 L. Sum Pressure Test 1 L. Sum Disinfection. A certified check, cashier's check or bid bond equal to 5 percent (5%) of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents