Last Updated 08/20/2020 04:16 PM
Project Title

Idylwilde Phase 3 Old Reservoir Site and Parking Lot

Physical Address View project details and contacts
City, State (County) Loveland, CO   (Larimer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes channel and floodplain restoration of the Big Thompson River and reconstruction of a portion of the adjacent US Hwy 34 embankment (Phase 3A), and reconstruction of the parking lot at the former Idylwilde Dam recreation area plus construction of an access trail from the parking lot to the floodplain (Phase 3B).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents