Similar Projects
RFQ - Round Lake State Park - Treehouse
New Construction, Infrastructure
Conception
$2,500,000 CJ est. value
Sagle, ID 83860

Milltown Park First Addition
New Construction, Infrastructure - 24,000 SF
Design
$7,000,000 CJ est. value
Sandpoint, ID 83864

Cabinet Gorge Hatchery Outdoor Brood Pond
Infrastructure
Design
$300,000 CJ est. value
Clark Fork, ID 83811

Utility Improvements - Ruth Avenue, Hickory Street, and Jefferson Street Project
Infrastructure
Post-Bid
$250,000 est. value
Sandpoint, ID 83809

Utility Improvements - Ruth Avenue Hickory Street Jefferson Street
Alteration
Post-Bid
$150,000 to $300,000 est. value
Sandpoint, ID

War Memorial Field Boat Launch Phase 2 - Floating Motorized Launch Facility
Alteration
Results
$450,000 est. value
Sandpoint, ID

Main Post Office Project
New Construction, Infrastructure - 2,432 SF
Results
$1,247,000 CJ est. value
Dover, ID 83825

Priest Lake White Pine Campground Electrical Upgrades
Renovation, Infrastructure
Construction
$419,000 CJ est. value
Coolin, ID 83821

Priest Lake White Pine Campground Electrical Upgrades
Renovation, Infrastructure
Construction
$419,000 CJ est. value
Coolin, ID 83821

Roberson Pines Way Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Sandpoint, ID 83864

Boyer Farm Estates Phase II Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sandpoint, ID 83864

Grouse Creek Road Relocation
Infrastructure
Design
$3,000,000 CJ est. value
Sandpoint, ID 83864

Albeni Falls Dam Spillway Gate Recoating and HSS Weld Repair
Infrastructure
Post-Bid
$25,000,000 CJ est. value
Laclede, ID 83841

Travers Park Renovations - Phase 1
Renovation, Infrastructure
Post-Bid
$7,784,247 CJ est. value
Sandpoint, ID 83864

Quilt Block Mastication
Infrastructure
Post-Bid
$100,000 est. value
Sandpoint, ID

Last Updated 12/09/2022 02:07 PM
Project Title

Water Intake Repairs

Physical Address View project details and contacts
City, State (County) Dover, ID 83825   (Bonner County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dock/Pier/Marine, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $260,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves replacement of raw water intake pump sleeves in the Pend Oreille River, Including the installation of coffer dams; dewatering; excavation and backfilling of trench; installation of two (2) new pump sleeve pipes; and the replacement of fifteen concrete weights with anchoring.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents