Similar Projects
Roadway Minor Rehab - SR 46
Infrastructure
Design
$838,000 CJ est. value
Niles, OH 44446

Roadway Minor Rehab - SR 46
Infrastructure
Design
$838,000 CJ est. value
Niles, OH 44446

Sustain Airfield Markings and Rubber Removal
Infrastructure
Bidding
$250,000 CJ est. value
Vienna, OH 44473

Sustain Airfield Markings and Rubber Removal
Infrastructure
Bidding
$250,000 CJ est. value
Vienna, OH 44473

2022 WRTA Sidewalk Project
Infrastructure
Post-Bid
$172,000 est. value
Warren, OH

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Hoagland Blackstub Road
Infrastructure
Results
$958,540 est. value
OH

TRU - 1st 2022 Countywide Road Improvements
Infrastructure
Results
$1,391,722 est. value
OH

Slope Stabilization
Infrastructure
Construction
$26,000 CJ est. value
Masury, OH 44438

Mosquito Lake State Park Marina Fuel System Trumbull
Infrastructure
Construction
$392,125 CJ est. value
Cortland, OH 44410

Trumbull Energy Center
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Lordstown, OH 44481

Trumbull Energy Center
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Lordstown, OH 44481

Roadway Minor Rehab - US 62
Infrastructure
Design
$4,250,000 CJ est. value
Cortland, OH 44410

Sherman Avenue Sidewalk Replacement
Infrastructure
Bidding
$106,420 CJ est. value
Niles, OH 44446

Chippewa Creek Flood Reduction Near Echo Lane Project
Infrastructure
Post-Bid
$9,051,740 CJ est. value
Warren, OH 44481

Last Updated 08/18/2023 09:32 AM
Project Title

Hubbard Public Library Asphalt Parking Lot Rehabilitation

Physical Address View project details and contacts
City, State (County) Hubbard, OH 44425   (Trumbull County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Library - Public, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $120,160 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be received for: General Construction Each bid must be accompanied by a Combination Bid Guaranty and Contract Bond in the sum of 100% of the amount of the Base Bid and all Alternates. The attention of bidders is also directed to the Equal Employment Opportunity regulations which are applicable to this project. If, in the opinion of the Owner or his/her delegated representative, the acceptance of the lowest bid is not in the best interest of the Owner, the Owner may accept another bid so opened or reject all bids and advertise for other bids. No bid may be withdrawn for a period of 60 days after closing time for receipt of bids. The Board Reserves the right to accept or reject any or all bids, to waive any informalities in bidding and to accept any bid deemed most favorable to the School District

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents