Similar Projects
Last Updated | 06/04/2020 09:43 AM |
Project Title | Perform Construction Materials Testing Services During the Rehabilitation of Wharf 9 at Turning Basin Terminal |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77000 (Harris County) |
Category(s) | Professional Services |
Sub-Category(s) | Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Wharf No. 9 project consists of upgrading the 600 feet of existing wharf to increase the operational capacity to 750 psf. Steel H -piles will be driven in the backlands of the dock. Soil nails will be driven to help the tieback the soil. The work will include patching and repairing of deteriorated pavement along the topside of the dock. The current fender system will be demolished, and a new fender system will be installed. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |