Similar Projects
Kak's Second Addition
New Construction
Conception
Watertown, SD 57201

Deer Mountain Residential Redevelopment
New Construction, Infrastructure
Conception
SD

Miller Ranch Subdivision
New Construction - 22,450 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Spearfish, SD 57783

Block 5 Project
New Construction, Infrastructure - 5,000 SF
Design
$60,000,000 CJ est. value
Rapid City, SD 57701

Scour Protection
Infrastructure
Bidding
$734,000 CJ est. value
Belle Fourche, SD 57717

Huron Multipurpose Building and Visitor Center
New Construction, Infrastructure - 9,000 SF
Bidding
$5,000,000 CJ est. value
Huron, SD 57350

Signing and Delineation
Infrastructure
Sub-Bidding
$958,000 CJ est. value
Tyndall, SD 57066

Building Demolition Julian Hall, Julian Addition and Brookman Hall
Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Vermillion, SD 57069

Structure Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Custer, SD

Phase 2 Grading Project - Central Park
Infrastructure
Post-Bid
$350,000 est. value
Harrisburg, SD

D & I Railroad Mainline and Crossing Improvements
New Construction, Alteration
Results
Brookings, SD

Rehabilitation of Runway 7-25
Infrastructure
Results
$6,510,854 CJ est. value
Pierre, SD 57501

Refuge Retreats Subdivision Improvements
Renovation - 173,998 SF
Construction
Aberdeen, SD 57401

Peters Subdivision
New Construction
Construction
Tea, SD 57064

Housing Development
New Construction
Pending Verification
Mitchell, SD 57301

Last Updated 08/12/2022 05:04 PM
Project Title

Build One 3-bedroom House (U No - 640)

Physical Address View project details and contacts
City, State (County) Rosebud, SD 57570   (Todd County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $303,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The SWA Corporation is accepting written proposals for the following scope of work, Build one 3-Three Bedroom house, from Indian Owned Contractors and Non-Indian Owned Contractors BUILDING SPECS/COMPLETE CONSTRUCTION Provide SWA Corporation with the best offer to build one (3) Three Bedroom House with the scope of work that we provide. Your company will be required to provide temporary electrical if needed, including all State Certificate Electrical permits and meters. Proposal must also include house moving, if building off-site. Location will be in Parmelee, South Dakota. SITE SPECS/COMPLETE SITE WORK SWA will provide the finish dirt work and the excavation for site. REQUIREMENTS TO ATTACH TO PROPOSAL: -Fully completed itemized cost proposal. -Indian Preference Application submitted by August 12, 2022 at 3:00 p.m. CST. -Attachment #3: Indian Preference in Subcontracting, Employment & Training. -Attachment #4: Previous Participation Certification -Attachment #5: Non-Collusive Affidavit -Attachment #6: Excluded Parties List Note: All of the RFP documents as detailed above must be submitted or the proposal shall be deemed non-responsive. INDIAN PREFERENCE Pursuant to Section 7(b) the Indian Self Determination and Education Assistance Act (25 U.S.C.450e (b)) and HUD requirements set forth at 24 CFR 1000.48-1000.54, in awarding this contract, preference shall be given to qualified Indian enterprises and organizations. Any proposal submitted must state that it will remain open for sixty (60) days. TECRO The successful offer must comply with the RST TECRO Ordinance, including any licensing requirements. Contact the RST TECRO Office at 605-747.-2322 for further information. TRIBAL TAXATION Firms must obtain a Tribal Business License prior to contract signing, including and not limited to used or sales excise tax. Contact the RST Tribal Taxation Office at 605-747-5045 for further information. INSURANCE Before commencing for work, the company must furnish the SWA Corporation with certificates of insurance showing that minimal insurance is in force and will insure all operations: Commercial General Liability- Combined single limit for bodily injury and property damage of not less than $300,000 per occurrence. Workmans Compensation- In accordance with State Workers Compensation laws. Automobile Liability- Combined single limit for bodily injury and property damage of not less than $300,000 per occurrence. Builders Risk (fire and extended)-Cost of the total unit. RIGHT TO REJECT ANY AND ALL PROPOSALS The SWA reserves the right to accept or reject any and all proposals. No member of the governing body, or persons directly involved with the SWA Corporation will have neither relationship, nor submittal privileges. For questions regarding specifications, please contact Darrell Douville, SWA Property Manager at 605-747-2203 ext. 243. For questions regarding proposal process, please contact Cheryl Douville Yellow Hawk, SWA Procurement Manager at 605.747.2203 ext. 236 or email: swaproc@swacorporation.com.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents