Project Title | RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project |
Physical Address | View project details and contacts |
City, State (County) | Tierra Amarilla, NM 87575 (Rio Arriba County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Request for Qualifications, Construction start expected June 2024 |
Bids Due | View project details and contacts |
Estimated Value | $86,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 15, 2023, per owner, the project has been delayed but it will still happen in the future. Estimated to post the project early 2024. ---------------- AMENDED SOURCES SOUGHT FOR THE EL VADO DAM SPILLWAYS AND DAM CREST MODIFICATIONS PROJECT The Bureau of Reclamation Acquisition Management Division, Provo Area Office in collaboration with Albuquerque Area Office, issues this special notice number DOIRFBO220012 for the El Vado Dam Spillways and Dam Crest Modifications Project, located in North Central New Mexico. This notice is for the purpose of determining potential offerors to act as the prime contractor for this project. This determination includes availability, capability, and small business status to support the project. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTE, OR AN INVITATION FOR BIDS and does not constitute any commitment by the Government. No reimbursement will be made for any costs associated with providing information in response to this notice. All interested sources must respond to future solicitation announcements separately from responses to the sources sought notice. The information obtained may be used for the future solicitation and all interested parties must respond to future solicitation announcement separately. PRINCIPAL COMPONENTS OF THE PROJECT: The following are the principal components of the work necessary to complete the project: A. Existing service spillway includes removal of existing service spillway (concrete crest structure, and steel lined chute), including radial gate and associated mechanical equipment, and removal of existing highway bridge. B. Existing dam crest features Includes removal of existing wave suppressor (and supporting steel and concrete members), top few feet of existing steel plates on dam face. C. Temporary soil nail stabilization along left inlet wall of existing concrete service spillway. After installation of soil nails, existing concrete floor of service spillway will be sawcut and removed. D. Excavation of approximately top 7 feet for over 1000 lineal feet of dam crest. E. Excavation for new service spillway alignment, including side slopes and for drainage system. F. Temporary excavation support/stabilization with untensioned rock dowels and shotcrete facing reinforced with welded wire reinforcement. Drainage behind the shotcrete facing will consist of geo-composite strip drains centered between each column of rock dowels. G. HDPE pipes, sand, gravel and access boxes for foundation drainage downstream of the crest and backfill drainage behind the crest structure walls. H. Reinforced concrete, lean concrete, concrete for mud mat, and test slab. I. Grouted anchor bars, foundation anchors, stoplog gate guides, and railings. J. Miscellaneous and structural backfill. K. Radial gate, gate operator, and gate hoists include coatings and galvanic anode cathodic protection, and heating elements. L. Power, gate controls and indicators, communications (i.e., SCADA), and engine generator set. M. Highway bridge with guardrails. N. Gate hoist deck with railings and ladders. O. Right abutment access road with guardrails. P. Dam crest modifications includes earthwork, upstream reinforced concrete parapet wall (with fencing), aggregate base course, asphalt pavement, and downstream guardrail. Q. Extension of the geomembrane composite from elevation 6905 to the base of the new concrete parapet wall, geomembrane composite placement over the existing left concrete parapet wall on dam crest, and the lean concrete backfill area along the left side of the new spillway approach wall. R. A zoned freeboard dike /fuse plug at the emergency spillway. S. Impressed current cathodic protection system. T. Protect, preserve, and abandon various piezometers and survey measurement points along the dam. Install QUESTIONS Questions regarding this notice shall be submitted in writing, through e-mail, referencing DOIRFBO220012 El Vado Dam Spillway to the Contracting Officer, Lisa Vance at lvance@usbr.gov no later than Wednesday August 24th, 2022 by close of business. The method of contractor selection has not been determined at this time. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |